The Best Construction Tenders Advertiser in Ethiopia

Tenders

Contractor

Read more

 

Consultant

Read more

 

Machinery Rental

Read more

 

Direct Unit Price

Read more

 

RC-1

Construction of Asphalt Road

Published on: Addis Zemen ( Sep 29, 2020 ) /Place of Bid Competitions:Adama

Remaining Time for Bid Submission

Invitation for Bids (IFB). International Competitive Bidding (ICB) 

Urban Local Government Development Projects 

Project:- Civil Works, Adama City 

Administration Construction Asphalt Road Bid Procurement No Adama/ST/CW/AS1/20/21 

  1.  Adama City Administration would like to invite eligible firms to construct Asphalt Road on the Back of Aba Goda Road and in front of Gore School 
  2. The Adama Co Administration now invites sealed bids from eligible bidders for furnishing of the necessary material, equipment and services for the Construction of Asphalt Road on the back of Aba Geda Road and in front of Goro School 
  3. Contractor must be duly registered by the Ministry Urban Development and Housing/Construction or Regional appropriate body under Category of GC-3/ RC 3 & above with valid license for the year 
  4. Interested eligible bidders may obtain further information from and inspect the bidding document of the office of Adama City Administration, from the Department of infrastructure in front of ODA School Adama City Administration P.O.Box 34 from 8:30 am to 12:30 pm and 1:30 pm to 5:30 pm Monday to Friday during working days.
  5. . A complete set of bidding documents may be purchased by interested bidders on the submission of a written application to the address stetted Sr , No 4 and upon payment of a non refundable fee of ETB 500. The method of payment will be in cash or cheque against receipt. . 
  6. The provisions in the Instructions to Bidders and in the General Conditions of Contract are the provisions of the PPA Standard Bidding Documents: Procurements of works 2011.
  7. . Bids will be delivered to the address below on or before 2:00 PM on following 30 Calendar days starting from the day of invitation to bid posted on newspaper and must be accompanied by a security of 200,000 ETB in the form of An unconditional guarantee, issued by a bank or CPO. 
  8.  Bids will be opened in the presence of bidders’ representatives who choose to attend at Adama City Administration on the same day at 2:30. pm. 
  9. The address referred to above is:Adama City Administration,Oromia National regional Government Tel No: 0221111583, Fax No: 0221114869 
  10. Tenders shall be valid for a period of 120 days after bid opening 
  11. Qualification requirement include;(1 Experience in related work and other works (2) ownership lor existing lease of relevant equipment and machinery, (3)availability of relevant experienced personnel as provided in the bidding document with other additional detail and justification as stated in SBD 
  12. The Adama City administration reserves the right to reject all or part of the bid 

Adama City Administration Construction 

Construction works of Iteya –Robe-Seru Road project…

Published on: Ethiopian Herald ( Sep 25, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

NOTICE OF INVITATION FOR BIDS

1.The Federal Democratic Republic of Ethiopia (FDRE) has allocated budget towards the cost of the following Road Construction Projects and intends to apply part of this budget to payments under these projects.

Package VII (7)
Item NoProject NameEstimatedLength (km)Pavement TypeProject DurationContract DeliveryProcurement Type
1Continuation of construction works of Iteya –Robe-Seru Road project LotII Robe Seru (KM 75+600 KM 143+875)68.3AC3.0 YearsDBBICB
2Construction Works of Seka- Atnago -Alga seyo Shenen -Guder Contract I Seka Atnago- Alga- N benja- seyo KM 0+000+93+00093AC4.0 YearsDBBICB
3Construction Works of Gog Jore Road Project Contract I LOT  II Km 36 –jorngogi Angela Km 36+000 km 69+40033.4AC4.0 YearsDBBICB
4Construction Works of Jijga- Quwarit -Arbgebeya- GishAbay Tilili Contract 1 Jiga-Quwarit-Arbgebeya59AC3.0 YearsDBBICB

Note: – DBB = Design, Bid and Build; ICB = International Competitive bidding; and AC = Asphalt Concrete

2. The Ethiopian Roads Authority now invites bidders to submit sealed bids for providing the necessary labor, material and equipment for construction works of the above road projects.

3. Interested bidders shall submit the following evidence:

a. In the case of Ethiopian bidders, Certificate of Registration from Ministry of Construction with the relevant Categories as specified in item 4 of tables below renewed for 2012 EFY and other appropriate documentary evidences demonstrating the bidder’s compliance, which shall include:

 i) Trading License renewed for 2012 EFY;

ii) Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid at bid submission date;

iii) VAT Registration Certificate; and

iv) Registration as Supplier in the list of the mandated public body, i.e. public Procurement and Property Administration Agency (PPPAA).

b. In case of bidders other than Ethiopians;

i) Business organization registration certificate or Trade License issued by the country of establishment.

ii) Tax Clearance Certificate issued from the Tax Authority (Inland Revenue Authority) which allows the bidder to participate in public tenders at the date of the deadline for bid submission if the foreign bidder already has on-going or completed projects in the Country, Ethiopia.

4. Bidding will be conducted through International Competitive Bidding (ICB) procedures as specified on the tables above and is open to all eligible bidders as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash Flow, General and Specific Construction Experience for each of the project is as shown below:

Qualification and Evaluation Criteria of Package VII (7) Road Projects

4.1Continuation of construction works of Iteya- Robe- Seru Road project LotII Robe Seru (KM 75+600 KM 143+875)

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 495 Million (Peak)ETB 1.238 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 928 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 154 MillionETB 206Million
3General Construction Experience2 Years Firm Experience under Construction Contracts in the role of  Contractor, Joint Venture Partner, or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of  Contractor, Joint Venture or Sub-Contractor.
4Specific construction project experienceA Minimum of One any type of asphalt DBST,TST OR AC Road Construction / Upgrading /Rehabilitation Project with a Value of ETB 1.300 Billion; ORA Minimum of Two Road any type of asphalt DBST,TST OR AC Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 650 Million;A Minimum of THREE Road any type of asphalt DBST,TST OR AC Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 433 Million; In all cases, the PROJECTS shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt  concrete Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.857 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5GradeRC – 1 or GC-1 

4.1.2 Construction Works of Seka- Atnago -Alga seyo Shenen -Guder Contract I Seka Atnago- Alga- N benja- seyo KM 0+000+93+000

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 611 Million (Peak)ETB 1.528 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 1.146 Billion (Average)
2Liquid Asset/Cash Flow RequirementETB 191 MillionETB 254 Million
3General Construction Experience2 Years Firm Experience under Construction Contracts in the role of, contractorJoint Venture Partner, or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of,contractor  Joint Venture Partner, or Sub-Contractor.
4Specific construction project experienceA Minimum of One any type of asphalt DBST,TST OR AC Road Construction / Upgrading /Rehabilitation Project with a Value of ETB 2.139 Billion; ORA Minimum of Two Road any type of asphalt DBST,TST OR AC Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 1.069Billion;A Minimum of THREE Road any type of asphalt DBST,TST OR AC Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 713 Million; In all cases, the expriances shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt  concrete Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 3.056 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5GradeRC – 1 or GC-1 

4.1.Construction Works of Gog Jore Road Project Contract I LOT  II Km 36 –jorngogi Angela Km 36+000 km 69+400

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 398 Million (Peak)ETB 995 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 746 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 124 MillionETB 165Million
3General Construction Experience2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experience A Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.393 Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 696 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 464 Million; In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt  concrete Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.990 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5GradeRC – 1 or GC-1 

4.14 Construction Works of Jijga -Quwarit -Arbgebeya- GishAbay -Tilili Contract 1 Jiga-Quwarit-Arbgebeya

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 491Million (Peak)ETB 1.227 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 920 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 153 MillionETB 204 Million
3General Construction Experience2 Years Firm Experience under Construction Contracts in the role of  Contractor, Joint Venture Partner,  or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of  Contractor, Joint Venture Partner,  or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.288 Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 644 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 429 Million;In all cases, the projects shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt  concrete Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.841 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5GradeRC – 1 or GC-1 

 5. If a bidder is awarded and /or recommended for award of any two works Contracts by ERA six months prior to the bid submission date of the subject projects and until award of the subject projects, the qualification criteria for the construction turnover will be the aggregate of the criteria of the subject projects, and that of the awarded Contracts and/or those recommended to be awarded. A detailed qualification criterion is stated in the respective bidding documents. 

6. Interested eligible bidders may obtain further information from and inspect the bidding documents at the address given below from 8:30 a.m. to 12:30 p.m. and 1:30 p.m. to 5:30 p.m. local time from Monday to Thursday, and from 8:30 to 11:30 a.m. and 1:30 p.m. to 5:30 p.m. local time on Friday. A complete set of bidding documents prepared in English language may be purchased by interested bidders on the submission of a written application to the address below and a nonrefundable fee of ETB 1,000 or USD 40 for each project, effective as of September 30, 2020. The method of payment shall be in cash or direct deposit to ERA’s account in the Commercial Bank of Ethiopia – Sengatera Branch through Account No. 0171533144600. Address: Ethiopian Roads Authority, New Building Block B. Engineering Procurement Directorate, 1st Floor, Office No. 102, Tel: +251-11-833 29 81/ 515-30-15. 

7. Bidders can apply for one or for all or for any number of projects from the above listed projects under the package and shall submit their bid separately for each project they are interested to apply for. However, bidders may be awarded on the projects under a package subjected to fulfilling of the Qualification Criteria for individual and multiple projects specified in the respective bidding documents based on the Employer’s best economical advantage. 

8. Bidders shall submit their Bids in two envelopes, the first envelop labeled as “Qualification Information and Bid Security” and the second envelope “Financial Bid”, separate sealed and the two envelopes sealed in another outer envelope. 

9. Evaluation is to be carried out in two stages, Qualification Information first and Financial Bids of qualified Bidders next. 

10. Bids must be delivered to the address, time and date specified below. Each bid must be accompanied by a bid security of ETB 500,000.00 for each project in a format acceptable to the employer. Late bids will be rejected. One Original and five Copics of the bids have to be submitted. The Qualification information and Bid Security will be opened immediately after the submission deadline in the presence of bidders’ representatives who choose to attend, at the address below. 

11. The value of total certified payments received in each year shall be adjusted for inflation of Birr value through multiplying by Cn/ Co factor, where Cn is value of 1 US Dollar in Birr on the 28 day prior to bid submission date and Co is the value of I US Dollar in Birt computed using the selling exchange rate prevailing on the last date of the respective fiscal year. 

12. For the Specific construction projects experience requirement, the Contract value of projects referenced by the bidder shall be adjusted to reflect the current purchasing power of Ethiopian Birr by multiplying with Cn/Co factor, where Cn is the current selling exchange rate of 1 US Dollar to Ethiopian Birr which is taken at the 28″ days prior to bid submission date and Co is the selling exchange rate of I US Dollar to Ethiopian Birr at the date of signing the Contract. 

13. Bids must be delivered to the address below on or before November 17, 2020 at 2:30 P.M. Director General New Building, Block B, 2nd Floor, Conference Room 

Ethiopian Roads Authority Ras Abebe Aregay Street 

P. O. Box 1770 Addis Ababa, Ethiopia 

Tel. +251-11-551 71 70/79 Fax: +251-11-5514866 

14. The Ethiopian Roads Authority reserves the right to accept or reject any or all bids. 

ETHIOPIAN ROADS AUTHORITY 

ለሆስፒታል ውሀ ጉድጓድ ግንባታ …

Published on: Addis Zemen ( መስከረም 15፣ 2013 ) /Place of Bid Competitions:ደጀን ከተማ 

Remaining Time for Bid Submission

የግንባታ ጨረታ ማስታወቂያ

በምሥራቅ ጎጃም አስተዳደር ዞን በደጀን ከተማ አስተዳደር ገ/ኢ/ት/ፅ/ ቤት በዓለም ባንክ በከልሉና በከተማ ው በጀት ድጋፍ በከተማው ውስጥ

  • 1ኛ የጠጠር መንገድ ግንባታ ከወንድሙ ምንውየ እስከ ሀይማኖት ካላ መ/ቤት ፓኬጅ ቁጥር Dejen ullDPCW/04/20/21 LOT 2
  • 2ኛ የእግረኛ መንገድ ግንባታ ከአህመድ ጀማል ሱቅ እስከ ኬላ በሁለቱም ሳይድ ፓኬጅ ቁጥር Dejen ullDP/CIP/CW/05/20/21 ሎት፡፡
  • 3ኛ የከብት በረት አጥር ግንባታ ፓኬጅ ቁጥር Dejen ullDP/CW/08/20/21 LOT 3
  • 4ኛ የዲች ግንባታ ማዶ ከጉልት ገበያ እስከ ቴ/ሙ/ኮሌጅ ፓኬጅ ቁጥር Deen UNDP/CW /10/20/21 LOT 3
  • 5ኛ ለሆስፒታል ውሀ ጉድጓድ ግንባታ ፓኬጅ ቁጥር Dejen  ullDP / CW/11/20/21 LOT 3 ለመስራት ተጫራችን በግልጽ ጨረታ አወዳድሮ ለማሰራት ይፈልጋል፡፡ ስለዚህ ከተማ አስተዳደሩ

የሚከተሉትን መስፈርቶች የምታሟሉ ተጫራቾች ለሙሉ መወዳደር የምትችሉ መሆኑን ይገልጻል ፡፡

  1. በዘመኑ ታደሰ ህጋዊ የንግድ ፈቃድ ያላቸው፣ የዘመኑን ግብር የከፈሉ ለመሆናቸው ማስረጃ ማቅረብ የሚችሉ፡፡
  2. የግብር ከፋይ መለያ ቁጥር /TIN/ ያላቸው፣
  3. የተጨማሪ እሴት ታክስ /VAT/ ከፋይነት የተመዘገቡ መሆናቸውን የሚያረጋግጥ የምስክር ወረቀት ማቅረብ የሚችሉ
  4. GC/RC ደረጃ 10 እና ከዚያ በላይ የሆናችሁ ለተቁ 4 GC/RC ደረጃ 9 እና ከዚያ በላይ ለተ.ቁ 1 GC ደረጃ 8 እና ከዚያ በላይ እንዲሁም RC ደረጃ 7 እና ከዚያ በላይ ለተቁ 2 GC/WC ደረጃ 10 እና ከዚያ በላይ ለተቁ 5 እና GC/BC ደረጃ 9 እና ከዚያ በላይ ለተ.ቁ 3
  5. ተጫራቾች በጨረታ ለመሳተፍ ከላይ በተ.ቁ 1 -4 የተጠቀሱትንና የሚመለከታቸውን ማስረጃዎች ፎቶ ኮፒ ከመጫረቻ ሰነዶቻቸው አያያዘው ማቅረብ አለባቸው፡፡
  6. የሥራው ዝርዝር መግለጫ ከጨረታ ሰነዱ ማግኘት ይቻላል፣
  7. ተጫራቾች እያንዳንዱ የጨረታ ሰነድ የማይመለስ ብር 200/ (ሁለት መቶ ብር)፣ በመከፈል ከደጀን ከተማ ገንዘብና ኢኮኖሚ ትብብር ፅ/ቤት ግ/ፋ/ን/አስ ቡድን ቢሮ ቁጥር 18 ይህ ጨረታ በአዲስ ዘመን ጋዜጣ በአየር ላይ ከወጣበት ቀን ጀምሮ የሚቆይ ለ21 ቀናት ማግኘት ይቻላል፡፡
  8. ተጫራቾች የጨረታማስከበሪያ ዋስትና /ቢድቦንድ/ በእያንዳንዱ ሎት ለሚወዳደሩበ ጠቅላላ ዋጋ ለተራ ቁጥር 1,23.000 ሃያ ሦስት ሺ ብር ለተራ ቁጥር 2 65,460(ስልሳ አምስት ሺህ አራት መቶ ስልሳ ብር) ለተራ ቁጥር 3 20,000 (ሃያ ሺህ ብር) ለተራ ቁጥር 413,600(አስራ ሶስት ሺህ ስድስት መቶ ብር) ብቻ እና በተራ ቁጥር 5 1,000(አንድ ሺ ብር) በባንክ በተረጋገጠ የክፍያ ትዕዛዝ ( ሲፒኦ)ወይም ስሁኔታ ላይ ያልተመሠረተ የባንክ ዋስትና ማስያዝ አለባቸው፡፡
  9. የጥቃቅንና አነስተኛ ኢንተርፕራይዞች በግዥ መመሪያው መሠረት ተጠቃሚ ይሆናል፡፡
  10. የጨረታ ሰነዱን አንድ ኦርጅናል ሁለት ፎቶ ኮፒ የቴክኒካልና ፋይናንሻል ዶክሜንት በጥንቃቄ በታሸገ ፖስታ ደጀን ከተማ ገንዘብና ኢኮኖሚ ትብብር ፅ/ቤት ግ/ፋ/አስ/ቡድን ቢሮ ቁጥር 18 በተዘጋጀው የጨረታ ሳጥን ዘወትር በሥራ ሰዓት እስከ 22ኛው ቀን 3፡30ሰዓት ድረስ ማስገባት ይኖርባቸዋል፡፡
  11. ጨረታው ተጫራቾች ወይም ህጋዊ ወኪሎቻቸው ባሉበት በቢሮ ቁጥር 18 በ22ኛው ቀን በ4፡00 ሰዓት ይከፈታል፡፡
  12. መ/ቤቱ የተሻለ አማራጭ ካገኘ ጨረታውን በከፊልም ሆነ ሙሉ በሙሉ የመሰረዝ መብቱ የተጠበቀ ነው፡፡
  13.  በጨረታው ለመሳተፍ የሚፈልጉ ስለጨረታው ዝርዝር መረጃ ከፈለጉ ቢሮ ቁጥር 18 ድረስ ሰአካል በመገኘት ወይም በስልክ ቁጥር 058-776-00-24/058776 10 09 በመደወል ማግኘት ይችላሉ፡፡

የደጀን ከተማ አስተዳደር

ገ/ኢ/ት/ፅ/ቤት

Continuation of construction works of Iteya –Robe-Seru Road project…

Published on:Ethiopian Herald ( Sep 25, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

NOTICE OF INVITATION FOR BIDS

1.The Federal Democratic Republic of Ethiopia (FDRE) has allocated budget towards the cost of the following Road Construction Projects and intends to apply part of this budget to payments under these projects.

Package VII (7)
Item NoProject NameEstimatedLength (km)Pavement TypeProject DurationContract DeliveryProcurement Type
1Continuation of construction works of Iteya –Robe-Seru Road project LotII Robe Seru (KM 75+600 KM 143+875)68.3AC3.0 YearsDBBICB
2Construction Works of Seka- Atnago -Alga seyo Shenen -Guder Contract I Seka Atnago- Alga- N benja- seyo KM 0+000+93+00093AC4.0 YearsDBBICB
3Construction Works of Gog Jore Road Project Contract I LOT  II Km 36 –jorngogi Angela Km 36+000 km 69+40033.4AC4.0 YearsDBBICB
4Construction Works of Jijga- Quwarit -Arbgebeya- GishAbay Tilili Contract 1 Jiga-Quwarit-Arbgebeya59AC3.0 YearsDBBICB

Note: – DBB = Design, Bid and Build; ICB = International Competitive bidding; and AC = Asphalt Concrete

2. The Ethiopian Roads Authority now invites bidders to submit sealed bids for providing the necessary labor, material and equipment for construction works of the above road projects.

3. Interested bidders shall submit the following evidence:

a. In the case of Ethiopian bidders, Certificate of Registration from Ministry of Construction with the relevant Categories as specified in item 4 of tables below renewed for 2012 EFY and other appropriate documentary evidences demonstrating the bidder’s compliance, which shall include:

 i) Trading License renewed for 2012 EFY;

ii) Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid at bid submission date;

iii) VAT Registration Certificate; and

iv) Registration as Supplier in the list of the mandated public body, i.e. public Procurement and Property Administration Agency (PPPAA).

b. In case of bidders other than Ethiopians;

i) Business organization registration certificate or Trade License issued by the country of establishment.

ii) Tax Clearance Certificate issued from the Tax Authority (Inland Revenue Authority) which allows the bidder to participate in public tenders at the date of the deadline for bid submission if the foreign bidder already has on-going or completed projects in the Country, Ethiopia.

4. Bidding will be conducted through International Competitive Bidding (ICB) procedures as specified on the tables above and is open to all eligible bidders as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash Flow, General and Specific Construction Experience for each of the project is as shown below:

Qualification and Evaluation Criteria of Package VII (7) Road Projects

4.1Continuation of construction works of Iteya- Robe- Seru Road project LotII Robe Seru (KM 75+600 KM 143+875)

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 495 Million (Peak)ETB 1.238 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 928 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 154 MillionETB 206Million
3General Construction Experience2 Years Firm Experience under Construction Contracts in the role of  Contractor, Joint Venture Partner, or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of  Contractor, Joint Venture or Sub-Contractor.
4Specific construction project experienceA Minimum of One any type of asphalt DBST,TST OR AC Road Construction / Upgrading /Rehabilitation Project with a Value of ETB 1.300 Billion; ORA Minimum of Two Road any type of asphalt DBST,TST OR AC Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 650 Million;A Minimum of THREE Road any type of asphalt DBST,TST OR AC Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 433 Million; In all cases, the PROJECTS shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt  concrete Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.857 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5GradeRC – 1 or GC-1 

4.1.2 Construction Works of Seka- Atnago -Alga seyo Shenen -Guder Contract I Seka Atnago- Alga- N benja- seyo KM 0+000+93+000

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 611 Million (Peak)ETB 1.528 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 1.146 Billion (Average)
2Liquid Asset/Cash Flow RequirementETB 191 MillionETB 254 Million
3General Construction Experience2 Years Firm Experience under Construction Contracts in the role of, contractorJoint Venture Partner, or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of,contractor  Joint Venture Partner, or Sub-Contractor.
4Specific construction project experienceA Minimum of One any type of asphalt DBST,TST OR AC Road Construction / Upgrading /Rehabilitation Project with a Value of ETB 2.139 Billion; ORA Minimum of Two Road any type of asphalt DBST,TST OR AC Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 1.069Billion;A Minimum of THREE Road any type of asphalt DBST,TST OR AC Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 713 Million; In all cases, the expriances shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt  concrete Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 3.056 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5GradeRC – 1 or GC-1 

4.1.Construction Works of Gog Jore Road Project Contract I LOT  II Km 36 –jorngogi Angela Km 36+000 km 69+400

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 398 Million (Peak)ETB 995 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 746 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 124 MillionETB 165Million
3General Construction Experience2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experience A Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.393 Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 696 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 464 Million; In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt  concrete Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.990 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5GradeRC – 1 or GC-1 

4.14 Construction Works of Jijga -Quwarit -Arbgebeya- GishAbay -Tilili Contract 1 Jiga-Quwarit-Arbgebeya

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 491Million (Peak)ETB 1.227 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 920 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 153 MillionETB 204 Million
3General Construction Experience2 Years Firm Experience under Construction Contracts in the role of  Contractor, Joint Venture Partner,  or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of  Contractor, Joint Venture Partner,  or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.288 Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 644 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 429 Million;In all cases, the projects shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt  concrete Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.841 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5GradeRC – 1 or GC-1 

 5. If a bidder is awarded and /or recommended for award of any two works Contracts by ERA six months prior to the bid submission date of the subject projects and until award of the subject projects, the qualification criteria for the construction turnover will be the aggregate of the criteria of the subject projects, and that of the awarded Contracts and/or those recommended to be awarded. A detailed qualification criterion is stated in the respective bidding documents. 

6. Interested eligible bidders may obtain further information from and inspect the bidding documents at the address given below from 8:30 a.m. to 12:30 p.m. and 1:30 p.m. to 5:30 p.m. local time from Monday to Thursday, and from 8:30 to 11:30 a.m. and 1:30 p.m. to 5:30 p.m. local time on Friday. A complete set of bidding documents prepared in English language may be purchased by interested bidders on the submission of a written application to the address below and a nonrefundable fee of ETB 1,000 or USD 40 for each project, effective as of September 30, 2020. The method of payment shall be in cash or direct deposit to ERA’s account in the Commercial Bank of Ethiopia – Sengatera Branch through Account No. 0171533144600. Address: Ethiopian Roads Authority, New Building Block B. Engineering Procurement Directorate, 1st Floor, Office No. 102, Tel: +251-11-833 29 81/ 515-30-15. 

7. Bidders can apply for one or for all or for any number of projects from the above listed projects under the package and shall submit their bid separately for each project they are interested to apply for. However, bidders may be awarded on the projects under a package subjected to fulfilling of the Qualification Criteria for individual and multiple projects specified in the respective bidding documents based on the Employer’s best economical advantage. 

8. Bidders shall submit their Bids in two envelopes, the first envelop labeled as “Qualification Information and Bid Security” and the second envelope “Financial Bid”, separate sealed and the two envelopes sealed in another outer envelope. 

9. Evaluation is to be carried out in two stages, Qualification Information first and Financial Bids of qualified Bidders next. 

10. Bids must be delivered to the address, time and date specified below. Each bid must be accompanied by a bid security of ETB 500,000.00 for each project in a format acceptable to the employer. Late bids will be rejected. One Original and five Copics of the bids have to be submitted. The Qualification information and Bid Security will be opened immediately after the submission deadline in the presence of bidders’ representatives who choose to attend, at the address below. 

11. The value of total certified payments received in each year shall be adjusted for inflation of Birr value through multiplying by Cn/ Co factor, where Cn is value of 1 US Dollar in Birr on the 28 day prior to bid submission date and Co is the value of I US Dollar in Birt computed using the selling exchange rate prevailing on the last date of the respective fiscal year. 

12. For the Specific construction projects experience requirement, the Contract value of projects referenced by the bidder shall be adjusted to reflect the current purchasing power of Ethiopian Birr by multiplying with Cn/Co factor, where Cn is the current selling exchange rate of 1 US Dollar to Ethiopian Birr which is taken at the 28″ days prior to bid submission date and Co is the selling exchange rate of I US Dollar to Ethiopian Birr at the date of signing the Contract. 

13. Bids must be delivered to the address below on or before November 17, 2020 at 2:30 P.M. Director General New Building, Block B, 2nd Floor, Conference Room 

Ethiopian Roads Authority Ras Abebe Aregay Street 

P. O. Box 1770 Addis Ababa, Ethiopia 

Tel. +251-11-551 71 70/79 Fax: +251-11-5514866 

14. The Ethiopian Roads Authority reserves the right to accept or reject any or all bids. 

ETHIOPIAN ROADS AUTHORITY 

Construction of asphalt and concrete road inside the plant compound

Published on: Reporter ( Sep 23, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

INVITATION TO OPEN BID FOR PLANT COMPOUND 

ROAD & STORMWATER DRAINAGE WORKS 

Repl Soap and Detergents Plc. is planning to erect a saponification plant at its plant compound located at Alemgena, near Furi-Lebu station of the Ethio-Djiboutí railway line. As part of its plant erection work, the company wants to construct asphalt and concrete road inside the plant compound. 

Existing road pavement is stopped at the sub-base level and planned to be completed partly with Asphalt and partly with concrete pavement as required. 

Repi Soap and Detergent Plc. are seeking eligible bidders for the road construction services. Services will include the supply of the necessary construction equipment, qualified professionals, material, labor, tools, and execution of the road and stormwater drainage works in the work scope of The project. The offeror shall be registered RC/GC of minimum grade 3 and above with previous related experience of Asphalt/Concrete Road works and should present a business license valid for the current physical year. Bidders should strictly follow the following instruction. 

  1. A completed set of documents purchased by interested bidders from the stated address and upon payment of a non-refundable fee of Birr 200.00 /two hundred Birr/ starting Tuesday, September 24, 2020. 
  2. Bidders shall submit one original and one copy of Technical and financial proposals separately to the address below on or before October 11, 2020, at 2:00 PM and must be accompanied by Birr 100,000.00 (One hundred thousand birr) security bid bond. The bid security shall be in the form of a Cashiers payment order (CPO), enclosed in a separate envelope & presented inside the Original bid document envelope. 
  3. Bids will be opened in the presence of the tender committee, on October 11, 2020, 2:30 at Repi Soap and detergent Factory premises. 
  4. The Bidder must accompany with his Bid copy of its Certificate of Registration from the relevant Authority, Renewed Trade license, TIN Registration Certificate and VAT registration document, and other relevant documents pertaining to the bid. 
  5. Repi soap and detergent PLC reserves the right to accept or reject part or all of the bidding process, 
  6. Interested & eligible bidders may obtain further information from the company supply chain department or request by email tofik.hussien@et.wilmar-intl.com   

Repi soap and detergent PLC., Sebeta Road, KolfeKeranio Sub City, 

Tel: +251113693545/+251113693518, Mob: +251966334320 

Website: www.repisc.com, Addis Ababa, Ethiopia 

Construction Works of Fik – Segeg – Gebro Road Project

Published on: Ethiopian Herald ( Sep 23, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

NOTICE OF INVITATION FOR BIDS

1.The Federal Democratic Republic of Ethiopia (FDRE) has allocated budget towards the cost of the following Road Construction Projects and intends to apply part of this budget to payments under these projects.

Package VI (6)
Item NoProject Name EstimatedLength (km)Pavement TypeProject DurationContract DeliveryProcurement Type
1Construction Works of Fik – Segeg – Gebro- Denan, Lot 1: Fik – Segeg (Km 0+000 – Km 90+000) Road Project90.0 DBST3.5 YearsDBBICB 
2Construction Works of Fik – Segeg – Gebro- Denan, Lot II: Segeg – Gebro – Yoale (Km 90+000 – Km 191+000) Road Project101.0 DBST3.5 YearsDBBICB 
3Construction Works of Negele Borena – Doloado – Melka Siftu, Lot 3: Filtu – Km 93 Road Project93.0 AC 3.0 Years DBBICB 
4Construction Works of Adola – Melka Desta – Harenfama Road Project74.9 AC 3.0 Years DBBICB 
5Continuation of Construction Works of Diri – Masha Road Project, Contract I: Gimbo – Konda (Km 61+960) Road Project61.96AC 3.0 Years DBBICB 

Note: – DBB = Design, Bid and Build; ICB = International Competitive Bidding; DBST = Double Bituminous Surface Treatment; and AC = Asphalt Concrete

2. The Ethiopian Roads Authority now invites bidders to submit sealed bids for providing the necessary labor, material and equipment for construction works of the above road projects.

3. Interested bidders shall submit the following evidence:

a. In the case of Ethiopian bidders, Certificate of Registration from Ministry of Construction with the relevant Categories as specified in item 4 of tables below renewed for 2012 EFY and other appropriate documentary evidences demonstrating the bidder’s compliance, which shall include:

 i) Trading License renewed for 2012 EFY;

ii) Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid at bid submission date;

iii) VAT Registration Certificate; and

iv) Registration as Supplier in the list of the mandated public body, i.e. public Procurement and Property Administration Agency (PPPAA).

b. In case of bidders other than Ethiopians;

i) Business organization registration certificate or Trade License issued by the country of establishment.

ii) Tax Clearance Certificate issued from the Tax Authority (Inland Revenue Authority) which allows the bidder to participate in public tenders at the date of the deadline for bid submission if the foreign bidder already has on-going or completed projects in the Country, Ethiopia.

4. Bidding will be conducted through International Competitive Bidding (ICB) procedures as specified on the tables above and is open to all eligible bidders as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash Flow, General and Specific Construction Experience for each of the project is as shown below:

Qualification and Evaluation Criteria of Package VI (6) Road Projects

4.1 Construction Works of Fik – Segeg – Gebro – Denan, Lot 1: Fik – Segeg (Km 0+000 – Km 90+000) Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 341 Million (Peak)ETB 852 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 639 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 106 Million ETB 142 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Gravel Road Construction / Upgrading /Rehabilitation Project with a Value of ETB 1.044 Billion; ORA Minimum of Two (2) Gravel Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 522 Million;A Minimum of Three (3) Gravel Road Construction / Upgrading /Rehabilitation Projects Each with a Value of ETB 348 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Any Type of Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.492 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

4.2 Construction Works of Fik – Segeg – Gebro – Denan, Lot II: Segeg – Gebro – Yoale (Km 90+000 – Km 191+000) Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 384 Million (Peak)ETB 960 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 720 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 120 Million ETB 160 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Gravel Road Construction / Upgrading /Rehabilitation Project with a Value of ETB 1.176 Billion; ORA Minimum of Two (2) Gravel Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB588 Million; ORA Minimum of Three (3) Gravel Road Construction / Upgrading /Rehabilitation Projects Each with a Value of ETB 392 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Any Type of Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.681 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

4.3 Construction Works of Negele Borena – Doloado – Melka Siftu, Lot 3: Filtu – Km 93 Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 419 Million (Peak)ETB 1.049 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 787 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 131 Million ETB 174 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experience A Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.102 Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 551 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 367 Million; In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.574 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

4.4 Construction Works of Adola – Melka Desta – Harenfama Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 731Million (Peak)ETB 1.829 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 1.372 Billion (Average)
2Liquid Asset/Cash Flow RequirementETB 228 Million ETB 304 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.921 Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 960 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 960 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 2.744 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

4.5 Continuation of Construction Works of Diri – Masha Road Project, Contract I: Gimbo – Konda (Km 61+960) Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 396 Million (Peak)ETB 990 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 743 Million (Average)
2Liquid Asset/Cash Flow RequirementETB123 Million ETB 165 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.04  Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 520 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 346 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.486 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

5. If a bidder is awarded and /or recommended for award of any two works contracts by ERA six months prior to the bid submission date of the subject projects and until the award of the subject projects, the qualification criteria for the construction turnover will be the aggregate of the criteria of the subject projects; and that of the awarded contracts and/or those recommended to be awarded. A detailed qualification criteria is stated in the respective bidding documents.

6. Interested eligible bidders may obtain further information from and inspect the bidding documents at the address given below from 8:30 a.m. to 12:30 a.m. and 1:30 p.m. to 5:30 p.m. local time from Monday to Thursday, and from 8:30 to 11:30 a.m. and 1:30 p.m. to 5:30 p.m. local time on Friday.

A complete set of bidding documents prepared in English language may be purchased by interested bidders on the submission of a written application to the address below and a nonrefundable fee of ETB 1,000 or USD 40 for each project, effective as of September 26, 2020. The method of payment shall be in cash or direct deposit to ERA’s account in the Commercial Bank of Ethiopia – Sengatera Branch through Account No. 01715-33144600. Address: Ethiopian Roads Authority, New Building Block A, Engineering Procurement Directorate, 1st Floor, Office No. 108, Tel: +251-11-833 29 81/ 515-30-15

7. Bidders can apply for one or for all or for any number of projects from the above listed projects under the packages and shall submit their bid separately for each project they are interested to apply for. However, bidders may be awarded on the projects under a package subjected to fulfilling of the Qualification Criteria for individual and multiple projects specified in the respective bidding documents based on the Employer’s best economical advantage .

8. Bidders shall submit their Bids in two envelopes, the first envelop labeled as “Qualification Information and Bid Security” and the second envelope “Financial Bid”, separate sealed and the two envelopes sealed in on another outer envelope.

9. Evaluation is to be carried out in two stages, Qualification Information first and Financial Bids of qualified Bidders next.

10. Bids must be delivered to the address, time and date specified below. Each bid must be accompanied by a bid security of ETB 500,000.00 for each project in a format acceptable to the employer. Late bids will be rejected. One Original and five Copies of the bids have to be submitted. The Qualification information and Bid Security will be opened immediately after the submission deadline in the presence of bidders’ representatives who choose to attend, at the address below.

11. The value of total certified payments received in each year shall be adjusted for inflation of Birr value through multiplying by Cn/Co factor, where Cn is value of 1 US Dollar in Birr on the 28th day prior to bid submission date and Co is the value of 1 US Dollar in Birr computed using the selling exchange rate prevailing on the last date of the respective fiscal year.

12. For the Specific construction projects experience requirement, the Contract value of projects referenced by the bidder shall be adjusted to reflect the current purchasing power of Ethiopian Birr by multiplying with Cn/Co factor, where Cn is the current selling exchange rate of 1 US Dollar to Ethiopian Birr which is taken at the 28th day prior to bid submission date and Co is the selling exchange rate of 1 US Dollar to Ethiopian Birr at the date of signing the contract.

13. Bids must be delivered to the address below on or before November 12, 2020 at 2:30 P.M.

Director General

2nd Floor, Conference Room

Ethiopian Roads Authority

Ras Abebe Aregay Street

P. O. Box 1770

Addis Ababa, Ethiopia

Tel. +251-11-551 71 70/79

Fax. +251-11-5514866

14. The Ethiopian Roads Authority reserves the right to accept or reject any or all bids.

ETHIOPIAN ROADS AUTHORITY

Construction of – Segeg – Gebro – Denan, Lot 1: Fik – Segeg (Km 0+000 – Km 90+000) Road Project …

Published on: Ethiopian Herald ( Sep 22, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

NOTICE OF INVITATION FOR BIDS

1.The Federal Democratic Republic of Ethiopia (FDRE) has allocated budget towards the cost of the following Road Construction Projects and intends to apply part of this budget to payments under these projects.

Package VI (6)
Item NoProject Name EstimatedLength (km)Pavement TypeProject DurationContract DeliveryProcurement Type
1Construction Works of Fik – Segeg – Gebro- Denan, Lot 1: Fik – Segeg (Km 0+000 – Km 90+000) Road Project90.0 DBST3.5 YearsDBBICB 
2Construction Works of Fik – Segeg – Gebro- Denan, Lot II: Segeg – Gebro – Yoale (Km 90+000 – Km 191+000) Road Project101.0 DBST3.5 YearsDBBICB 
3Construction Works of Negele Borena – Doloado – Melka Siftu, Lot 3: Filtu – Km 93 Road Project93.0 AC 3.0 Years DBBICB 
4Construction Works of Adola – Melka Desta – Harenfama Road Project74.9 AC 3.0 Years DBBICB 
5Continuation of Construction Works of Diri – Masha Road Project, Contract I: Gimbo – Konda (Km 61+960) Road Project61.96AC 3.0 Years DBBICB 

Note: – DBB = Design, Bid and Build; ICB = International Competitive Bidding; DBST = Double Bituminous Surface Treatment; and AC = Asphalt Concrete

2. The Ethiopian Roads Authority now invites bidders to submit sealed bids for providing the necessary labor, material and equipment for construction works of the above road projects.

3. Interested bidders shall submit the following evidence:

a. In the case of Ethiopian bidders, Certificate of Registration from Ministry of Construction with the relevant Categories as specified in item 4 of tables below renewed for 2012 EFY and other appropriate documentary evidences demonstrating the bidder’s compliance, which shall include:

 i) Trading License renewed for 2012 EFY;

ii) Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid at bid submission date;

iii) VAT Registration Certificate; and

iv) Registration as Supplier in the list of the mandated public body, i.e. public Procurement and Property Administration Agency (PPPAA).

b. In case of bidders other than Ethiopians;

i) Business organization registration certificate or Trade License issued by the country of establishment.

ii) Tax Clearance Certificate issued from the Tax Authority (Inland Revenue Authority) which allows the bidder to participate in public tenders at the date of the deadline for bid submission if the foreign bidder already has on-going or completed projects in the Country, Ethiopia.

4. Bidding will be conducted through International Competitive Bidding (ICB) procedures as specified on the tables above and is open to all eligible bidders as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash Flow, General and Specific Construction Experience for each of the project is as shown below:

Qualification and Evaluation Criteria of Package VI (6) Road Projects

4.1 Construction Works of Fik – Segeg – Gebro – Denan, Lot 1: Fik – Segeg (Km 0+000 – Km 90+000) Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 341 Million (Peak)ETB 852 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 639 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 106 Million ETB 142 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Gravel Road Construction / Upgrading /Rehabilitation Project with a Value of ETB 1.044 Billion; ORA Minimum of Two (2) Gravel Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 522 Million;A Minimum of Three (3) Gravel Road Construction / Upgrading /Rehabilitation Projects Each with a Value of ETB 348 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Any Type of Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.492 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

4.2 Construction Works of Fik – Segeg – Gebro – Denan, Lot II: Segeg – Gebro – Yoale (Km 90+000 – Km 191+000) Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 384 Million (Peak)ETB 960 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 720 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 120 Million ETB 160 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Gravel Road Construction / Upgrading /Rehabilitation Project with a Value of ETB 1.176 Billion; ORA Minimum of Two (2) Gravel Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB588 Million; ORA Minimum of Three (3) Gravel Road Construction / Upgrading /Rehabilitation Projects Each with a Value of ETB 392 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Any Type of Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.681 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

4.3 Construction Works of Negele Borena – Doloado – Melka Siftu, Lot 3: Filtu – Km 93 Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 419 Million (Peak)ETB 1.049 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 787 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 131 Million ETB 174 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experience A Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.102 Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 551 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 367 Million; In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.574 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

4.4 Construction Works of Adola – Melka Desta – Harenfama Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 731Million (Peak)ETB 1.829 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 1.372 Billion (Average)
2Liquid Asset/Cash Flow RequirementETB 228 Million ETB 304 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.921 Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 960 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 960 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 2.744 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

4.5 Continuation of Construction Works of Diri – Masha Road Project, Contract I: Gimbo – Konda (Km 61+960) Road Project

Item/ No.Qualification CriteriaMinimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 396 Million (Peak)ETB 990 Million (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 743 Million (Average)
2Liquid Asset/Cash Flow RequirementETB123 Million ETB 165 Million 
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 1.04  Billion; ORA Minimum of Two (2) Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation Project with a Value of ETB 520 Million; ORA Minimum of Three (3) Any Type of Asphalt (DBST, TST or AC) Road Construction / Upgrading / Rehabilitation Projects Each with a Value of ETB 346 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Asphalt (DBST, TST Or AC) Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.486 BillionWithin the last ten (10) years that has been successfully and substantially completed (80% completed)
5Specific ConstructionProject experienceRC – 1 or GC-1  

5. If a bidder is awarded and /or recommended for award of any two works contracts by ERA six months prior to the bid submission date of the subject projects and until the award of the subject projects, the qualification criteria for the construction turnover will be the aggregate of the criteria of the subject projects; and that of the awarded contracts and/or those recommended to be awarded. A detailed qualification criteria is stated in the respective bidding documents.

6. Interested eligible bidders may obtain further information from and inspect the bidding documents at the address given below from 8:30 a.m. to 12:30 a.m. and 1:30 p.m. to 5:30 p.m. local time from Monday to Thursday, and from 8:30 to 11:30 a.m. and 1:30 p.m. to 5:30 p.m. local time on Friday.

A complete set of bidding documents prepared in English language may be purchased by interested bidders on the submission of a written application to the address below and a nonrefundable fee of ETB 1,000 or USD 40 for each project, effective as of September 26, 2020. The method of payment shall be in cash or direct deposit to ERA’s account in the Commercial Bank of Ethiopia – Sengatera Branch through Account No. 01715-33144600. Address: Ethiopian Roads Authority, New Building Block A, Engineering Procurement Directorate, 1st Floor, Office No. 108, Tel: +251-11-833 29 81/ 515-30-15

7. Bidders can apply for one or for all or for any number of projects from the above listed projects under the packages and shall submit their bid separately for each project they are interested to apply for. However, bidders may be awarded on the projects under a package subjected to fulfilling of the Qualification Criteria for individual and multiple projects specified in the respective bidding documents based on the Employer’s best economical advantage .

8. Bidders shall submit their Bids in two envelopes, the first envelop labeled as “Qualification Information and Bid Security” and the second envelope “Financial Bid”, separate sealed and the two envelopes sealed in on another outer envelope.

9. Evaluation is to be carried out in two stages, Qualification Information first and Financial Bids of qualified Bidders next.

10. Bids must be delivered to the address, time and date specified below. Each bid must be accompanied by a bid security of ETB 500,000.00 for each project in a format acceptable to the employer. Late bids will be rejected. One Original and five Copies of the bids have to be submitted. The Qualification information and Bid Security will be opened immediately after the submission deadline in the presence of bidders’ representatives who choose to attend, at the address below.

11. The value of total certified payments received in each year shall be adjusted for inflation of Birr value through multiplying by Cn/Co factor, where Cn is value of 1 US Dollar in Birr on the 28th day prior to bid submission date and Co is the value of 1 US Dollar in Birr computed using the selling exchange rate prevailing on the last date of the respective fiscal year.

12. For the Specific construction projects experience requirement, the Contract value of projects referenced by the bidder shall be adjusted to reflect the current purchasing power of Ethiopian Birr by multiplying with Cn/Co factor, where Cn is the current selling exchange rate of 1 US Dollar to Ethiopian Birr which is taken at the 28th day prior to bid submission date and Co is the selling exchange rate of 1 US Dollar to Ethiopian Birr at the date of signing the contract.

13. Bids must be delivered to the address below on or before November 12, 2020 at 2:30 P.M.

Director General

2nd Floor, Conference Room

Ethiopian Roads Authority

Ras Abebe Aregay Street

P. O. Box 1770

Addis Ababa, Ethiopia

Tel. +251-11-551 71 70/79

Fax. +251-11-5514866

14. The Ethiopian Roads Authority reserves the right to accept or reject any or all bids.

ETHIOPIAN ROADS AUTHORITY

Construction Works of Awash-Kulbi – Dire Dawa/ Harar Overlay Road Project…

Published on: Ethiopian Herald ( Sep 18, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

NOTICE OF INVITATION FOR BIDS

1.The Federal Democratic Republic of Ethiopia (FDRE) has allocated budget towards the cost of the following Road Construction Projects and intends to apply part of this budget to payments under these projects.

Package V (5)
It. No. Project Name Estimated Length (Km)Pavement Type Project Duration Contract Delivery Procurement Type 
1Construction Works of Awash-Kulbi – Dire Dawa/ Harar Overlay Road Project; Contract I : Awash – Meiso (Km 0+000 – 70+500)(Re-Bid) 70.5AC3.0 yearsDBBNCB
2Awash – Kulbi – Dire Dawa/Harar Overlay Road Project; Contract II: Meiso – Hirna (Km 70+500 – 139+468) (Re-Bid)68.97AC3.0 yearsDBBNCB
3Awash – Kulbi – Dire Dawa/Harar Overlay Road Project; Contract III: Hirna – Duse (Km 139+468 – 225+000) (Re-Bid)85.53AC3.0 yearsDBBNCB
4Awash Kulbi Dire Dawa/Harar Overlay Road Project; Contract IV: Duse – Dengego – Harar & Dengego- Dire Dawa (KM225+000-290+864 & 0+000-19+541) (Re-Bid)85.41AC3.0 yearsDBBNCB
5Construction Works of Addis – Gibe River Road Overlay Project; Lot II- Sebeta (Km 15+000) – Kore (Km 79+000) (Re-Bid) 64.0AC3.0 yearsDBBNCB

Note: – DBB = Design, Bid and Build; NCB = National Competitive Bidding; and AC = Asphalt Concrete

2. The Ethiopian Roads Authority now invites bidders to submit sealed bids for providing the necessary labor, material and equipment for construction works of the above road projects.

3. Interested bidders shall submit the following evidence:

a In the case of Ethiopian bidders, Certificate of Registration from Ministry of Construction with the relevant Categories as specified in item 4 of tables below renewed for 2012 EFY and other appropriate documentary evidences demonstrating the bidder’s compliance, which shall include:

i) Trading License renewed for 2012EFY;

ii) Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid at bid submission date;

iii) VAT Registration Certificate; and

iv) Registration as Supplier in the list of the mandated public body, i.e. public Procurement and Property Administration Agency(PPPAA).

b. In case of bidders other than Ethiopians;

i) Business organization registration certificate or Trade License issued by the country of establishment.

ii) Tax Clearance Certificate issued from the Tax Authority (Inland Revenue Authority) which allows the bidder to participate in public  tenders at the date of the deadline for bid submission If the foreign bidder already has on-going or completed projects in the Country; Ethiopia.

4. Bidding will be conducted through a National Competitive Bidding (NCB) procedures as specified on the tables above and is open to all eligible bidders as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash Flow, General and Specific Construction Experience for each of the project is as shown below:

4.1 Qualification and Evaluation Criteria of Package V(5) Road Projects

4.1.1 Construction Works of Awash – Kulbi – Dire Dawa/Harar Overlay Road Project:

Contract I: Awash – Meiso (Km 0+000 – 70+500) (Re-Bid)

It .NoQualification criteriaMinimum Requirement 
Local Bidders Foreign Bidders
1Annual Construction Turnover for the Last Five Years ETB 135 Million (Peak)ETB 337 Million (Average) 
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 253 Million (Average).
2Liquid Asset/Cash Flow RequirementETB 42 MillionETB 56 Million
3General Construction experience2 Years firm experience under construction contracts in the role  of prime Contractor, Joint Venture partner or Sub-Contractor. 5 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner or Sub-Contractor. 
4Specific Construction Project ExperienceA Minimum of One (1) any type of Asphalt (DBST, TST or AC) Road Construction/Upgrading/ Rehabilitation/Overlay Project with a value of ETB 354 Million; OR A Minimum of Two (2) any type of Asphalt (DBST, TST or AC)Road Construction /Upgrading/Rehabilitation/Overlay projects each with a value of ETB 177 Million.In both cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt Concrete (AC) Road Construction / Upgrading / Rehabilitation / Overlay Projects each with a value of at least ETB 506 Million within the last ten (10) years that has been successfully and substantially completed (80% Completed). 
5GradeRC – 1 or GC – 1  
     

Construction Works of Awash- Kulbi-Dire Dawa/Harar Overlay Road Project II:Meiso-Hirna(km 70+500-139+468)(Re-Bid)

It .NoQualification criteriaMinimum Requirement 
Local Bidders Foreign Bidders
1Annual Construction Turnover for the Last Five Years ETB 267 Million (Peak)ETB 669 Million (Average) 
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 502 Million (Average).
2Liquid Asset/Cash Flow RequirementETB 83 MillionETB 111 Million
3General Construction experience2 Years firm experience under construction contracts in the role of  prime Contractor, Joint Venture partner or Sub-Contractor.5 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner or Sub-Contractor. 
4Specific Construction Project Experience A Minimum of One (1) any type of Asphalt (DBST, TST or AC) Road  Construction/Upgrading/Rehabilitation/Overlay Project with a value  of ETB 703 Million; OR A Minimum of Two (2) any type of Asphalt(DBST, TST or AC) Road Construction / Upgrading/Rehabilitation/Overlay projects each with a value of ETB 351 Million; ORA  Minimum of Three (3) any type of asphalt (DBST, TST or AC)RoadConstruction / Upgrading / Rehabilitation projects each with a value  of ETB 234 Million;In all cases, the experiences shall be within the last ten (10) years thathas been successfully and substantially completed (70% Completed). A Minimum of Two Two (2) Asphalt Concrete (AC) Road Construction/Upgrading / Rehabilitation/Overlay Projects each with a value of at least ETB 1.004 Billion within the last ten (10) years that has been successfully and substantially completed (80% Completed). 
5GradeRC – 1 or GC – 1  
     

4.13 Construction Works of Awash-Kulbi-Dire Dawa/Harar Overlay Road Project; Contract III:Hirna-Duse(km 139+468-225+000)(Re-Bid

It .NoQualification criteriaMinimum Requirement 
Local Bidders Foreign Bidders
1Annual Construction Turnover for the Last Five Years ETB 313 Million (Peak)ETB 784 Million (Average) 
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 588 Million (Average).
2Liquid Asset/Cash Flow RequirementETB 98 MillionETB 130 Million
3General Construction experience2 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner or Sub-Contractor.5 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner or Sub-Contractor.
4Specific Construction Project ExperienceA Minimum of One (1) any type of Asphalt (DBST, TST or AC) Road Construction /Upgrading / Rehabilitation/Overlay Project with a value of ETB 823 Million; OR A Minimum of Two (2) any type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/ Rehabilitation/ Overlay projects each with a value of ETB 411 Million;ORA Minimum of Three (3) any type of asphalt (DBST, TST or AC)Road  Construction / Upgrading / Rehabilitation projects each with a value of ETB 274 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed). A Minimum of Two (2) Asphalt Concrete (AC) Road Construction /Upgrading / Rehabilitation/Overlay Projects each with a value of at least ETB 1.176 Billion within the last ten (10) years that has been successfully and substantially completed (80% Completed). 
5GradeRC – 1 or GC – 1  
     

4.14 Construction Works of Awash-Kulbi-Dire Dawa/Harar Overlay Road Project

Contract IV: Duse-Dengego-Harar & Dengego-Dire Dawa (KM 225+000-290+864 & 0+000-19+541)(Re-Bid)

It .NoQualification criteriaMinimum Requirement 
Local Bidders Foreign Bidders
1Annual Construction Turnover for the Last Five Years ETB 327  Million (Peak)ETB 818 Million (Average) 
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 614 Million (Average).
2Liquid Asset/Cash Flow RequirementETB 102 MillionETB 136 Million
3General Construction experience2 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner or Sub-Contractor. 5 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner or Sub-Contractor. 
4Specific Construction Project ExperienceA Minimum of One (1) any type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation/Overlay Project with a value of ETB 859 Million; OR A Minimum of Two (2) any type of Asphalt (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation/ Overlay projects  each with a value of ETB 429 Million; OR A Minimum of Three (3) any type  of asphalt (DBST, TST or AC)Road Construction / Upgrading / Rehabilitation projects each with a value of ETB 286 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt Concrete (AC)Road Construction / Upgrading/ Rehabilitation/ Overlay Projects each with a value of at least ETB 1.228 Billion within the last ten (10) years that has been successfully and substantially completed (80% Completed). 
5GradeRC – 1 or GC – 1  
     

4.15 Construction Works of Addis- Gibe River Road Overlay Project : Lot II Sebeta (km 15+000)-Kore(km 79+000)(Re-Bid)

It .NoQualification criteriaMinimum Requirement 
Local Bidders Foreign Bidders
1Annual Construction Turnover for the Last Five Years ETB 326  Million (Peak)ETB 815 Million (Average) 
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 611 Million (Average).
2Liquid Asset/Cash Flow RequirementETB 101 MillionETB 135 Million
3General Construction experience2 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner or Sub-Contractor.5 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner or Sub-Contractor. 
4Specific Construction Project ExperienceA Minimum of One (1) any type of Asphalt (DBST, TST or AC) Road Construction/Upgrading/Rehabilitation/Overlay Project with a value of ETB 856 Million; OR A Minimum of Two (2) any type of Asphalt  (DBST, TST or AC) Road Construction / Upgrading/Rehabilitation/ Overlay projects each with a value of ETB 428 Million; OR A Minimum of Three (3) any type of asphalt (DBST, TST or AC)Road Construction / Upgrading / Rehabilitation projects each with a value of ETB 285 Million;In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt Concrete (AC) Road Construction / Upgrading / Rehabilitation/Overlay Projects each with a value of at least ETB 1.223 Billion within the last ten (10)years that has been successfully and substantially completed (80% Completed) 
5GradeRC – 1 or GC – 1  
     

4. If a bidder is awarded and /or recommended for award of any two works Contracts by ERA six months prior to the bid submission date of the subject projects and until award of the subject projects, the qualification criteria for the construction turnover will be the aggregate of the criteria of the subject projects; and that of the awarded Contracts and/or those recommended to be awarded. A detailed qualification criterion is stated in the respective bidding documents.



5. Interested eligible bidders may obtain further information from and inspect the bidding documents at the address given below from 8:30 a.m. to 12:30 p.m. and 1:30 p.m. to 5:30p.m.local time from Monday to Thursday, and from8:30to11:30a.m.and1:30 p.m. to 5:30 p.m. local time on Friday.

A complete set of bidding documents prepared in English  language may be purchased by interested bidders on the  submission of a written application to the address below and  a nonrefundable fee of ETB 1,000 or USD 40 for each project,  effective as of September 21, 2020. The method of payment shall  be in cash or direct deposit to ERA’s account in the Commercial  Bank of Ethiopia – Sengatera Branch through Account No.  01715-33144600.

Address: Ethiopian Roads Authority, New Building Block B,

Engineering Procurement Directorate, 1st Floor, Office No. 102,

Tel: +251-11-833 29 81/515-30-15.5.

6. Bidders can apply for one or for all or for any number of projects  from the above listed projects under the package and shall  submit their bid separately for each project they are interested  to apply for. However, bidders may be awarded on the projects  under a package subjected to fulfilling of the Qualification  Criteria for individual and multiple projects specified in the  respective bidding documents based on the Employer’s best Economical advantage.

7. Bidders shall submit their Bids in two envelopes, the first envelop  labeled as “Qualification Information and Bid Security” and the  second envelope “Financial Bid”, separate sealed and the two  envelopes sealed in on other outer envelope.

8. Evaluation is to be carried out in two stages, Qualification  Information first and Financial Bids of qualified Bidders next.

9. Bids must be delivered to the address, time and date specified  below. Each bid must be accompanied by a bid security of ETB 500,000.00 for each project in a format acceptable to the employer. Late bids will be rejected. One Original and five Copies of the bids have to be submitted. The Qualification information and Bid Security will be opened immediately after the submission deadline in the presence of bidders’ representatives who choose to attend, at the address below.

10.The value of total certified payments received in each year shall be adjusted for inflation of Birr value through multiplying by Cn/Co factor, where Cn is value of 1 US Dollar in Birr on the 28 day prior to bid submission date and Co is the value of 1 US Dollar in Birr computed using the selling exchange rate prevailing on the last date of the respective fiscal year.

11. For the Specific construction projects experience requirement, the Contract value of projects referenced by the bidder shall be adjusted to reflect the current purchasing power of Ethiopian Birr by multiplying with Cn/Co factor, where Cn is the current selling exchange rate of 1 US Dollar to Ethiopian Birr which is taken at the 28thdays prior to bid submission date and Co is the selling exchange rate of 1 US Dollar to Ethiopian Birr at the date of signing the Contract.

12.Bids must be delivered to the address below on or before November 05, 2020 at 2:30 P.M.

Director General

New Building, Block B, 2nd Floor, Conference Room Ethiopian

Roads Authority

Ras Abebe AregayStreet

P. O. Box 1770 Addis Ababa, Ethiopia Tel. +251-11-551 7170/79

Fax: +251-11-5514866

13. The Ethiopian Roads Authority reserves the right to acceptor reject any or all bids.

ETHIOPIAN ROADS AUTHORITY

GENERAL PROCUREMENT NOTICE OF ERA

Published on: Ethiopian Herald ( Sep 18, 2020 )

ETHIOPIAN ROADS AUTHORITY 

GENERAL PROCUREMENT NOTICE 

The Federal Democratic Republic of Ethiopia (FDRE) represented by the Ethiopian Roads Authority (ERA) has secured sufficient budget and planned to procure construction works and related supervision services for the following road projects in the year 2013 Ethiopian Fiscal Year. The procurement process of the projects will commence depending on the readiness of the design and will be floated in groups of projects in a package sequentially. 

Item NoWorks to be procuredFinancerLength KMContract Delivery
1Abay Bridge Approch Road and Abay 
Bridge Lot 2 :Abay Bridge Approach Road) 
GOE4.4DB
2Access to Adama industrial park GOE3.31DB
3Gog-Jore – Akobo Lot: 2 Km 35 – Km 70 GOE33.4DBB
4

Seka – Atnago – Alga – Seyo – Shenen – Guder Lot 1; Seka – Atnago – Alga – Seyo 
GOE93DBB
5Seka – Atnago – Alge – Seyo – Shenen – Guder Lot 3; Ambo Town and Ambo – Guder Town Road GOE20DB
6Fik-Segege-Grebo-Denane Lot 1 GOE90DBB
7

Fik-Segege-Grebo-Denane Lot 2 
GOE101DBB
8Dubiti-Arisa-Adigala-Biyokobob; Contract 2 GOE78DB
9

Dubiti-Arisa-Adigala-Biyokobob; Contract 3 
GOE119DB
10Zalambesa-Alitena-Marwa-Edegahamus Lot 2: Marwa-Edegahamus GOE38DB
11

Dembecha – Feresebet – Adet Lot 2: Sekela-Adet 
GOE61.7DB
12Jiga – Quwarit – Arb gebeya – Gish Abay – Tlili Lot 1: Jiga – Quwarit – Arb gebeya GOE59DBB
13

Mehal Meda – Gisherabiel – Mekoy – Milamile Lot 2 : Tormsaya/K.m 64-Milamile 
GOE63.1DBB
14

Nignang-Toha(Ongonge) 
GOE77.5DBB
15Fishagenet-Kele-Someya-Segen-Gebelebeno Lot 3: Segen-Gebelbeno GOE61DB
16




Dilla – Bulle – Haro Wacho-Shakiso Lot 2: Harowacho-Shakiso 
GOE57DBB
17Dembi Dolo-Gambela Lot 2 GOE50DB
18Agaro-Gera-Medabo GOE100DB
19

Adola – Melkadesta – Harenfema – 
GOE74.9DBB
20Bishoftu Expressway Approch Road GOE5DB
21

Gambella-Abobo-Goge-Dima Lot 3: Gilo River-Akuwela-Achagna-Dima 
GOE80DB
22Sodo Town Sections (Sodo – Town – Areka 
Junction, Sodo Town – Agricultural College and Sodo Town – Woli) 
GOE15.5DBB
23

Hojadure – Goro – Kenate 
GOE68DB
24

Hamusit – Este/Mekaneyesus – Simada -Sayient – Buso, Lot 3: Simada – Sayient – Buso 
GOE62.7DBB
25Gendesheno – Ejere – Gundomeskel – Woleka – Keymebrat Lot 1 Gendesheno – Ejere – Gundomeskel GOE90DBB
26

Continuation of construction works of Iteya -Robe – Seru Lot 2: Robe – Seru Road project 
GOE68.28DBB
27

Continuation of construction works of Debark – Buahit – Dilyibza DB Road Project 
Lot I: Debark – Buahit 
GOE61.8DB
28Continuation of construction works of Debark – Buahit – Dilyibza DB Road Project 
Lot II; Buahit – Dilyibza 
GOE72.9DB
29Continuation of construction works of Debark – Buahit – Dilyibza DB Road Project 
Lot II; Buahit – Dilyibza 
GOE61.96DBB
30Continuation of Construction works of Aykel – Zufan – Angereb; Lot 1 Aykel (Km 0+000) 

Km 69+000 Road Project 
GOE69DBB
31

Continuation of Adura – Akobo and Adura – Burbey Road Project 
GOE125.4DBB
32

Alamata – Chelana – Merewa – Tsetsere – Dela : Lot 1 Alamata – Km 65 
GOE72.2DBB
33

Debremarkose-DebreEliyas-Temecha-Kuch-Ayehu-Zegem-Chagni Lot 4: Ambla-Zigem – Chagni 
GOE86.3DBB
34

Kesa-Gimja Bet-Azena-Ambela 
GOE62DBB
35

Bure-Gomer 
GOE41.5DBB
36Homosha – Hidase Dam – Guba Lot 2 Km 70 – Hidase Dam – Guba GOE147DBB
37

Kobo – Kulmusk – Lalibella Lot 1: Muja- Kobo 
GOE60DBB
38

Guliso – Cheliya – Dilla – Kendila – Begi – Yayo/ South Sudan Boarder Lot 2 
GOE82.5DBB
39

Guliso – Cheliya – Dilla – Kendila – Begi – Yayo/ South Sudan Boarder Lot 3 
GOE60DBB
40Chebera Churchura – Gudumu GOE79DB
41

Bojeber-Areqit – Kutere – Bilalo 
GOE58DB
42

Alamata – Chelana – 100Merewa – Tsetsere – Dela – Samere Lot 2: K.m. 65-Tsetsere- Dela 
GOE70DBB
43Alemgena – Butajira-Sodo Lot 1: Alemgena – Butajira GOE100DBB
44

Negele Borena – Doloado – Melkasuftu Lot 3 Filtu – Doloado 
GOE93DBB
45Morka-Gircha-Chench-Chano Lot 2: Chencha-Chano GOE22DBB
46

Semera – Yalo – Mehoni 
GOE90DBB
47

Bulehora – Shakiso – Kibiremengest Lot 2: Km 70- Bulehora 
GOE72DBB
48Alemgena – Butajira-Sodo Lot 2: Butajira-Hosaina GOE100DBB
49Gimbi – Guye – Alga – Metu Lot 2: Km60-Metu GOE70DBB
50Hagayu – Sigmo – Saylem – Leqa – Becho – Metu: Lot 1 GOE70DB
51

Halaba-Siraro – Shemana – Hawassa Airport Jun/Erba Junction 
GOE63DBB
52

Gerahusenay – Ahiferom/Sero 
GOE40DBB
53Sekota – Amdework – Tekeze – Ibnat – Addis Zemen: Lot 1 GOE70DB
54Bati – Medina – Harewa – Bora – Kemise GOE110DB
55

Hawassa – Loke – Hantacho – Chuko 
GOE47DBB
56Aletawondo – Teferikela – Dilla GOE24DBB
57

Hosaina – Jajura – Gimbichu – Jako 
GOE50DBB
58

Gnigang. Jikawo-Dobrar– Rek 
GOE130DB
59Gelego – Tewodros Ketema – Guba Lot 2; Tewodros KetemaOmedila – Almahili – Mankush – Guba, Contract 1 GOE90DBB
60Goba – Dolomena – Negele Borena/Bitata/ Lot 1 Goba 
Dolomena 
GOE100DB
61Ginir-Gode Lot 1 GOE70DB
62Degehamedo – Degehabur GOE75DB
63Arbaminch – Wezeka – Konso – Jinka Lot 1 Arbaminch-Konso GOE135DB
64Arbaminch – Wezeka – Konso – Jinka Lot 2 Konso – Jinka GOE135DB
65

Kombolcha-Mekaneselam, Lot I 
GOE100DB
66Mekaneselam-Abay River Bridge-Gindewoyin GOE122DB
67Durgi – Gibe River – Omo Nada Lot 3; Gibe River – Omo Nada GOE50DBB
68Metema – Abrihajira – Maserodenb – Sanja, Lot 2, Cont. I: Abrihajira-km-80 GOE80DB
69Negele Borena – Dolo Odo – Melkasuftu Lot 2: Km 60 – Filtu GOE62DBB
70Jihur-Zemero-Degolo-Wereilu-Guguftu, Lot 1, Cont. 1: Jihur-Zemero GOE78DB
71Wacha-Maji, Lot 1 GOE90DB
72

Gilgel Beles-Dibate-Wenbera 
GOE58DB
73

Makisegnit – Degoma – Arbaya – Guhala – Setseka – Mesheha – Abi 
Adi Junction 
GOE80.71DB
74Dima-Bero-Kibish/k.m. 90-F4F6 Road Junction Lot 2: Kibish/Km 
90-F4F6 Road Junction 
GOE67DBB
75

Kofele-Kore – Bekoji and Arsi Negele – Bilalo Junction 
GOE68DB
76

Adi Gudem – Dengolat – Gejet – Yechela 
GOE71.27DB
77

Birki-Hayikmashal-Atsibi Junction 
GOE20DB
78Filtu – Moyale: Lot 1 GOE70DB
79

Tolta-Gelila-Laska and Shirshir-Wubhamer Sper 
GOE125DBB
80Ebantu(Hindi) – Ayana – Gelilla – Haro Limu – Yaso GOE95DB
81Awash – Kulibi – Dire Dawa/Harer Overlay Road Project; Contract I: Awash – Meiso (Km 0+000-70+500)(Re-tender) GOE70.5DBB
82Awash – Kulibi – Dire Dawa/Harer Overlay Road Project: Contract II: Meiso – Heirna (km 70+500-139+468)(Re-tender) GOE68.97DBB
83Awash – Kulibi – Dire Dawa/Harer Overlay Road Project; Contract III: Himna – Duse (km 139+468 225+000) (Re-tender) GOE85.53DBB
84Awash – Kulibi – Dire Dawa/Harer Overlay Road Project; Contract 
IV: Duse – Dengego – Harer & Dengego – Dire Dawa (km 225+000 
290+864 & 0+000 – 19+541) (Re-tender) 
GOE85.41DBB
85Addis – Gibe River Road Overlay Project Lot II; Sebeta-Kore GOE64DBB
86Addis – Gibe River Road Overlay Project; Lot III; Kore – Gibe 
River 
GOE93DBB

The selection of bidders will be carried out either by International Competitive Biddings (ICB) procedure or National Competitive Biddings (NCB) procedure based on the specific project requirements and conditions. Subsequently, the Specific Procurement Notice for each of the projects will be announced separately through nationally circulating newspaper (Ethiopian Herald), Ethiopian Roads Authority’s (ERA’s) website (www.era.gov.et) as well as through Public Procurement and Property Administration Agency’s (PPPAA’s) website (www.ppa.gov.et) and through appropriate further publications as deemed necessary. Addresses for Correspondences: Zekarias G/Giorgis, Engineering Procurement Directorate, Director 

Ethiopian Roads Authority P.O.Box: 1770 

Subcontract the Earthwork including Clearing and Grubbing, Roadbed Preparation, Excavation…

Published on:Reporter ( Sep 16, 2020 ) /Place of Bid Competitions:Ababa Ethiopia

Remaining Time for Bid Submission

Notice of Bid Invitation for Construction Work

(Procurement No. BEAEKA/ED/01/2020)

  1.  BEAEKA General Business PLC has signed a contract Agreement with Ethiopian Roads Authority for the construction of Jijiga-Gelelesh-Deghamedo-Segeg Road Project; (Contract II: Km 55+400-Km 165+220) and intends to subcontract the Earthwork including Clearing and Grubbing, Roadbed Preparation, Excavation, Embankment Construction and sub-base construction, From station 135+400to 150+000 (Lot I) and 150+000 to 165+220 (Lot II) in two lots to eligible contractors.
  2.  BEAEKA General Business PLC now invites registered constructors of category GC-4, RC-3 and above with their professional and trade license valid for the year 2012 E.C/ registered for VAT and having tax clearance for local contractors to submit sealed bids for providing the necessary labor, materials, and equipment for the Earthwork including clearing and Grubbing, Roadbed preparation, Excavation, Embankment Construction and sub-base for each of the lots indicated.
  3. The works to be carried out under this sub-contract comprises Clearing and Grubbing, Road Bed Preparation, in situ Roadbed Treatment, Excavation, Embankment Construction and sub-base construction. The road shall have a cross section of 10m (7m DBST carriageway and 1.5m gravel shoulder on each side or as per the drawings for different sections). The road is DS4 standard and the subcontractor is expected to construct the sub-contract work as per the drawings and specifications of the main contract.
  4. Interested eligible bidders may obtain further information and inspect the bidding documents at the BEAEKA General Business PLC at the address given below from 8:30 to 12:30 am and 1:30 to 5:30 pm from Monday to Friday local time. Complete set of bidding documents in English may be purchased by interested bidders as of September 25/2020 at the above office upon presentation of the document mentioned under item (2) above and a written application addressed to the company and upon payment of a non-refundable fee of Birr 500. Address: BEAEKA GENERAL BUSINESS PLC, SEMIEN MAZAGAJA ON THE WAY TO ADDISU GEBEYA, ADJACENT TO POLAND EMBASSY, BEAEKA BUILDING, 4th FLOOR, TEL: +251930481594
  5. Bidders shall submit two envelopes, “Qualification information and Bid security” and “Financial Bid” separately sealed and the two envelopes should also be sealed in an outer single envelope.
  6.  Evaluation is to be carried out in two stages, qualification information first and Financial Bids of qualified Bidders next.
  7.  Bidders could choose to partake in one or both lots.
  8.  Bids must be delivered to the address below on or before Oct 25/2020 at 10:00 A.M in the morning. All bids must be accompanied by a bid security of ETB 50,000.00 and late bids will be rejected. Qualification information and bid security will be opened in the presence of bidder’s representatives who choose to attend, at the address below on October 25/2020 at 10:30 A.M in the morning.
  9. For any of your inquires please contact BEAEKA GENERAL BUSINESS PLC, Engineering Department Manager, Addis Ababa Ethiopia Tel. +251930-48-15-94/+251935-99-87-86
  10. BEAEKA GENERAL BUSINESS PLC reserves the right to accept or reject any or all bids without giving any reasons.

BEAEKA GENERAL BUSINESS PLC.

Construction of Access Roads in Elidaar woreda of Afar

Published on:Ethiopian Herald ( Sep 10, 2020 ) /Place of Bid Competitions:Samara, Afar Region

Remaining Time for Bid Submission

SPECIFIC PROCUREMENT

NOTICE FOR NATIONAL COMPETITIVE BIDDING

Date:- 10 September 2020

BMZ Project Number: – 201167006

Construction Procurement

Ref. No: BOLANRD/DRSLP/KfW-Sdr/NCB/W02/2020

1. The Federal Democratic Republic of Ethiopia has received Financing from KfW Development Bank, A German Financial Cooperation with Ethiopia, towards Regional Fund for Improving Drought Resilience in Ethiopia. It is intended that part of the proceeds of this fund will be applied to eligible payments under the contract for the Procurement of Construction of Access Roads in Elidaar woreda of Afar National Regional State in Ethiopia.

2. The Bureau of Livestock, Agriculture & Natural Resources Development now invites sealed bids from eligible and qualified bidders (contractors) having RC/GC Category 2 Trade License and above for the delivery of the works.

Project Measures: The purpose of the project is to strengthen the production systems of the pastoralists and agro-pastoralists, to increase their income and diversify their livelihoods thus contributing to enhance the drought resilience of communities in selected cross-border regions in the arid and semi-arid lands (ASAL).

The project is implemented in Afar and Somali regions and is organized in three main components;

  1. Water Resource Development and Rural Infrastructure,
  2. Improvement of Rangelands and fodder production and
  3. Alternative Livelihood Initiatives and Basic Service Development.

Requested Works: The Construction Rural Roads will contribute to the Component 1: Water Resources Development and Rural Infrastructure. The contractor will Construct 22 km Access Road Elidaar to Siyaro kebele in Elidaar wereda of Afar National Governmental State.

3. Interested eligible bidders may obtain further information and inspect copy of the bidding document at the office address given below in the morning from 7:00 AM to 12:00 PM and in the afternoon from 9:00 PM to 6:00 PM Monday to Friday

4. A complete set of bidding documents may be purchased by interested bidders upon payment of a nonrefundable fee of ETB 350.00 (Three Hundred Fifty) or its equivalent in a freely convertible currency.

5. Bids must be delivered to the office on or before 10:00 AM (04:00 AM local time) on – 08 October, 2020 and must be accompanied by a bid security in the amount ETB 200,000.00 (Two Hundred Thousand) or its equivalent in a freely convertible currency.

6. Bids will be opened in the presence of bidders’ representatives, who choose to attend at 10:30 AM (04:30 AM local time) on the same date of closing, 08 October ,2020 at the Address below.

Afar National Regional State, Bureau of Livestock, Agriculture & Natural Resources Development (BOLANRD)

Procurement, Finance and Property Administration Support

Process First Floor, Room No. 01,

Tel. +251-033-666-022/033-666-243,

Samara, Afar Region

Addis Ababa City Road Network

Published on: Ethiopian Herald ( Sep 9, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

NOTICE OF INVITATION FOR BID

1. The Addis Ababa City Road Authority, acting as a representative of the Addis Ababa City Administration has allocated budget towards the cost of the following RoadProjects of the Addis Ababa City Road Network

2. The description of the projects is as follow

2.1. Arabsa – ICT Park Design & Build Road Project

The project roads start from Arabsa 6 pass through Bole – Lemi Industry Park, ICT Park and ends at Kilinto Goro Expressway road. The project road is categorized as Primary Arterial Pass 60, Expressway road with 60m width (23m median left for future expansion and BRT), according to the master plan of Addis Ababa and the Road Project is intended to harmonize mobility of traffic.

The duration of the project is 30 months, including 180 Calendar days (6 months) for design Period and mobilization. The contract delivery method of the projectis Design and Build (DB).

2.2. Construction Works of Kotebe Kidanemehiret – Kotebe Dehnenet Sefer Road Project

The project consists of construction of the 1.5km length roads to dual carriageway each two lane asphalt surfaced with raised footpath on both sides. The project also includes the construction of structures like culverts and ancillary works

The project road is located in Yeka Sub-city of Addis Ababa City. It starts at around Kidanemehiret Church (480005.02E, 998588.61N), and ends at Hanamariam Church (481352.97E, 999209.52N),

The period of completion is 570 Calendar Days (19 months) from the date of commencement including 3 months (90 Calendar days) for clearance of Right of way obstructions.

2.3. Construction works of Beshale Condominium Asphalt Road Project

Beshale Condominium Asphalt Road Project is located within Beshale condominium. It has 8 segments having 20m width for segment 1 (one) and 2(Two) and 15m width with the remaining segments 3,4,5,6,7 and 8.

The duration of the project is 9 months, including 3 months for right of way and mobilization

3. The Addis Ababa City Roads Authority (AACRA) now invites bidders to submit sealed bids for providing the necessary labour, material and equipment for construction of the above road project.

4. Interested bidders shall submit the following evidence:

a) In case of Ethiopian Bidders:

i. Certificate of Registration from Ministry of Urban Development, Housing and Construction or other appropriate regional bureaus with

Category GC-1 or RC-1 renewed for 2012 EFY for Arabsa – ICT Park Design & Build Road Project:

Category RC-3 and/or GC-3 and above renewed for 2012 EFY for Construction Works of Kotebe Kidanemehiret – Kotebe Dehnenet Sefer Road Project;

Category RC-2 and/or GC-2 and above renewed for 2012 EFY for Construction works of Beshale Condominium Asphalt Road Project:

  • ii. Trading License renewed for 2012 EFY;
  • iii. Tax Clearance Certificate, which states that the bidder can be participate in any public tender and valid at the deadline for submission of the bids:
  • iv. VAT Registration Certificate;
  • v. Registration as Supplier in the list of the mandated Public body, i.e. Public Procurement and Property Administration Agency (PPPAA);

b) In case of bidders other than Ethiopians; Business Organization Registration Certificate or Trade License issued by the country of establishment.

5. Bidding will be conducted through the National Competitive Bidding (NCB) procedures and is open to all eligible contractors as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash flow, General and Specific Experience for the project are as shown below:

5.1. Arabsa – ICT Park Design & Build Road Project

No. QualificationCriteriaMinimum Requirement for AACA Financed Projects, as per the Criteria approved by AACRA DG
For Local BiddersFor Foreign BiddersJV b/n Local andForeign Bidders
1Annual construction Turnover (ACT)ETB 521 Million (Peak)ETB 1.042 Billion(Average) ETB 782 Million(Average) 
2Liquid asset /cashflow requirement(CF)ETB 130.3 Million ETB 173.7 Million ETB 173.7 Million 
3General construction ExperienceA minimum of Two (2) years of experience under construction contracts in therole of Contractor, Joint Venture partner or Sub-Contractor prior to the deadlinefor bid submission A minimum of Five(5) years of experience under construction contracts in the role of Contractor, Joint Venture partner or Sub-Contractor prior to the deadline for bid submissionA minimum of Five (5)years of experience under construction contracts in the role of Contractor, Joint Venture partner or Sub-Contractor prior to the deadline for bid submission 
4Specific constructionprojects experienceAt least one (1) new or upgrading or rehabilitation road airfield construction project with any asphalt surfacing type including asphalt concrete or bituminous surface treatments with a minimum length of 32 km which is 75% successfully and substantially completed within the last 10 years as Contractor, Joint Venture partner or Sub Contractor with a contract price of at least ETB 1.303 Billion. ORAt least two (2) new or upgrading or rehabilitation road/airfield construction projects with any asphalt surfacing type including asphalt concrete or bituminous surface treatments each with a minimum length of 16.0 km which is 75% successfully and substantially completed within the last 10 years as Contractor, Joint Venture partner or Sub-Contractor each with a contract price of at least ETB 651.5 MillionOrAt least two (3) new or upgrading or rehabilitation road/airfield construction projects with any asphalt surfacing type including asphalt concrete or bituminous surface treatments each with a minimum length of 10.7 km which is 75% successfully and substantially completed within the last 10 years as Contractor, Joint Venture partner or Sub-Contractor each with a contract price of at least ETB434.3 Million At least two (2) new or upgrading or rehabilitation road construction projects with asphalt concrete surfacing each with a minimum length of 32 km which are 85% successfully and substantially completed within the last 10 years as Contractor, Joint Venture partner or Sub-Contractor  each with a contract price of at least ETB 1.303 Billion At least two (2) new or upgrading or rehabilitation road construction projects with asphalt concrete surfacing each with a minimum length of 32 km which are 85% successfully and substantially completed within the last 10 years as Contractor, Joint Venture partner or Sub-Contractor  each with a contract price of at least ETB 1.303 Billion 

 5.2. Construction Works of Kotebe Kidanemehiret – Kotebe Dehnenet Sefer Rond Project

No.Qualification Criteria Minimum Requirement for AACA Financed Projects, as per the Criteria approved by AACRA DG
For Local BiddersFor Foreign BiddersJV b/n Local and Foreign Bidders
1Annual construction Turn over (ACT) ETB 130 Million (Peak)ETB 260 Million (Average)ETB 195 Million (Average)
2Liquid asset /cash flow requirement (CF)ETB 32.50 Million ETB 43.40 Million ETB 43.40 Million 
3General construction ExperienceA minimum of Two (2) years of experience underconstruction contracts in the role of Contractor, JointVenture partner or Sub-Contractor prior to the deadlinefor bid submission A minimum of Five (5) years of experience under construction contracts in the role of Contractor, Joint Venture partner or Sub Contractor prior to the deadline for bid submission A minimum of Five (5) years of experience under construction contracts in the role of Contractor, Joint Venture partner or Sub Contractor prior to the deadline for bid submission 
4Specific construction projects experienceAt least one (1) new or upgrading or rehabilitation road/ airfield construction project with any asphalt surfacing type including asphalt concrete or bituminous surface treatments with a minimum length of 4.3 Km which is at least 75% successfully and substantially completed withinthe last 10 years as Contractor, Joint Venture partner or Sub-Contractor with a contract price of at least ETB 206MillionORAt least one (2) new or upgrading or rehabilitation road/ airfield construction project with any asphalt surfacing type including asphalt concrete or bituminous surface treatments with a minimum length of 2.15 Km which is at least 75% successfully and substantially completed withinthe last 10 years as Contractor, Joint Venture partner or Sub-Contractor with a contract price of at least ETB 103 Million At least two (2) new or upgrading or rehabilitation road construction projects with asphalt concrete surfacing each with a minimum length of 4.3 Km which are at least 85% successfully and substantially completed within the last ten (10) years as Contractor, Joint Venture partner or Sub-Contractor each with a contract price of at least ETB 206 Million At least two (2) new or upgrading or rehabilitation road construction projects with asphalt concrete surfacing each with a minimum length of 4.3 Km which are at least 85% successfully and substantially completed within the last ten (10) years as Contractor, Joint Venture partner or Sub-Contractor each with a contract price of at least ETB 206 Million

5.3. Construction works of Beshale Condominium Asphalt Road Project

No.Qualification CriteriaMinimum Requirement for AACA Financed Projects, as per the Criteria approved by AACRA DG 
For Local BiddersFor Foreign BiddersJV b/n Local and Foreign Bidders 
 
1Annual construction Turnover (ACT)ETB 410.7 Million (Peak) ETB 821.3 Million (Average) ETB 616 Million (Average)  
2Liquid asset/ cash flow requirement (CF)ETB 102.7 Million ETB 136.9 Million ETB 136.9 Million  
3General construction ExperienceA minimum of Two (2) years of experience underconstruction contracts in the role of Contractor,Joint Venture partner or Sub-Contractor prior to thedeadline for bid submission.A minimum of Five (5) years of experience under construction contracts in the role of Contractor, Joint Venture partner or Sub Contractor prior to the deadline for bid submission A minimum of Five (5) years of experience under construction contracts in the role of Contractor, Joint Venture partner or Sub Contractor prior to the deadline for bid submission  
4Specific construction projects experienceAt least one (1) new or upgrading or rehabilitation road/ airfield construction project with any asphalt surfacing type including asphalt concrete or bituminous surface treatments with a minimum length of 8.7 Km which is 75% successfully and substantially completed within the last 10 years as Contractor, Joint Venture partner or Sub-Contractor with a contract price of at least ETB 308 Million.Or At least one (1) new or upgrading or rehabilitation road/ airfield construction project with any asphalt surfacing type including asphalt concrete or bituminous surface treatments with a minimum length of4.35 Km which is 75% successfully and substantially completed within the last 10 years as Contractor, Joint Venture partner or Sub-Contractor with a contract price of at least ETB 154 Million. At least two (2) new or upgrading or at least two (2) new or rehabilitation road construction projects with asphalt concrete surfacing each with a minimum length of 8.7 Km which are 85% successfully and substantially completed within the last ten (10) years as Contractor, Joint Venture partner or Sub-Contractor each with a contract price of at least ETB 308 Million. At least two (2) new or upgrading or at least two (2) new or rehabilitation road construction projects with asphalt concrete surfacing each with a minimum length of 8.7 Km which are 85% successfully and substantially completed within the last ten (10) years as Contractor, Joint Venture partner or Sub-Contractor each with a contract price of at least ETB 308 Million.  

6. If a Bidder was awarded and /or recommended for award of any works contract/s by AACRA with in the last 6 (six) month prior to the bid submission, the qualification criteria for the construction turnover will be the aggregate of the criteria of the subject project; and criteria of the awarded contract/s and/or those recommended to be awarded.

7. Interested eligible bidders may obtain further information from and inspect the bidding documents at the address given below from 8:30 to 12:30 A.M and 1:30 to 5:30P.M from Mondays to Thursdays and 8:30 to 11:30 A.M and 1:30 P.M to 5:30 P.M on Fridays.

A complete set of bidding document prepared in English language may be purchased by interested bidders on the submission of a written application to the address below and a nonrefundable fee of ETB 100 for each project effective as of September 14, 2020. The method of payment shall be in cash.

Address: Addis Ababa City Roads Authority

Engineering Procurement Directorate

Ground Floor, Room No. 39

Tel: 251-11-372-89-48

Addis Ababa, Ethiopia

8. Bidders shall submit their bids in two envelopes, “Qualification information & Bid Security” in one envelope and “Financial Bid” separately in another envelope and the two envelops sealed in on other outer envelopes.

9. Evaluation is to be carried out in two stages, Qualification Information first and Financial Bids of qualified bidders next.

10. The value of total certified payments received in each year (Annual Construction Turnover) shall be adjusted for inflation of Birr value by multiplying them by Cn/Cofactor, where Cn is the value of 1 US Dollar in Birr on the date 28 days prior to the bid submission date and Co is the value of 1 US Dollar in Birr computed using the exchange rate prevailing on the last date of the respective fiscal year.

11. For the specific construction project experience requirement, the contract price of projects referenced by the Bidder shall be adjusted to reflect the current purchasing power of Ethiopian Birr by multiplying with Cn/Co factor, where Cn is the current selling exchange rate of 1 US Dollar to Ethiopian Birr which is taken at the 28th days prior to bid submission date and Co is the selling exchange rate of 1 US Dollar to Ethiopian Birr at the date of signing the contract. The basis of computing the Dollar value of Birr shall be the selling exchange rate issued by the National Bank of Ethiopia.

12. Bids must be delivered to the address below on or before October 13, 2020 at 2:30 P.M. All bids must be accompanied by a bid security of ETB 500,000.00 (ETB: Five Hundred Thousand) for each project. Late bids will be rejected. One original and four copies of the bids have to be submitted. The Qualification information and Bid security of the bidders will be opened immediately after the submission deadline in the presence of bidders’ representatives who chose to attend at the address below.

Director-General

Addis Ababa City Roads Authority

In front of Alexander Pushkin Roundabout

P. O. Box 9206

Addis Ababa, Ethiopia

Tel. +251-11-372-89-53/48

13. The Addis Ababa City Roads Authority reserves the right to accept or reject any or all bids.

ADDIS ABABA CITY ROADS AUTHORITY

Construction works of dessie bypass road project

Published on: Ethiopian Herald ( Aug 27, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

NOTICE OF INVITATION FOR BIDS

The Federal Democratic Republic of Ethiopia (FDRE) has allocated budget towards the cost of the following Road Construction Projects and intends to apply part of this budget to payments under these projects. 

Package IV (4) 

Item NoProject NameEstimated Length KmPayment TypeProject durationContract deliveryProcurement type
1Construction works of dessie bypass road project17.0AC2.5 YearsDBBICB
2Construction works of combolcha bypass road project7.11AC2.0YearsDBBNCB

Note: – DBB = Design, Bid and Build; ICB = International Competitive Bidding; NCB = National Competitive Bidding; and AC = Asphalt Concrete 

2. The Ethiopian Roads Authority now invites bidders to submit sealed bids for providing the necessary labor, material, and equipment for construction works of the above road projects. 

3. Interested bidders shall submit the following evidence: 

a. In the case of Ethiopian bidders, Certificate of Registration from Ministry of Construction with the relevant Categories as specified in item 4 of tables below renewed for 2012 EFY and other appropriate documentary evidence demonstrating the bidder’s compliance, which shall include: i) Trading License renewed for 2012 EFY; Р 

ii) Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid at bid submission date; ) VAT Registration Certificate; and 

iv) Registration as Supplier in the list of the mandated public body, i.e. public Procurement and Property Administration Agency (PPPAA). 

b. In case of bidders other than Ethiopians; i) Business organization registration certificate or Trade License issued by the country of establishment. 

ii) Tax Clearance Certificate issued from the Tax Authority (Inland Revenue Authority) which allows the bidder to participate in public tenders at the date of the deadline for bid submission if the foreign bidder already has on-going or completed projects in the Country; Ethiopia. 

4. Bidding will be conducted through International Competitive Bidding (ICB) and National Competitive Bidding (NCB) procedures as specified on the tables above and is open to all eligible bidders as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash Flow, General and Specific Construction Experience for each of the project is as shown below: Qualification and Evaluation Criteria of Package IV (4). Road Projects 

4.1. Construction Works of Dessie Bypass Road Project 

Item/NoQualification Criteria Minimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 432 Million (Peak)ETB 1.081 Billion(Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 810 Million (Average).
2Liquid Asset/Cash Flow Requirement ETB 135 MillionETB 180 Million
3General Construction 2 Years of firm experience under construction contracts, Joint Venture partner, Management Contractor or Sub Contractor5 Years of firm experience under construction contracts in the role of prime Contractor, Joint Venture partner, Management Contractor or Sub Contractor
4Specific Construction Project ExperienceA Minimum of One (1) road maintenance or Construction/rehabilitation/ up grading project with a value of at least ETB 945 Million;  ORA Minimum of Two (2) any road maintenance or  Construction/rehabilitation/ up grading project  each with a value of at least ETB 472 Million;In all cases, the experiences shall be within the last ten (10) years that have been successfully and substantially completed (70% Completed).A Minimum of Two (2) heavy road maintenance or  Construction/rehabilitation/ up grading project  each with a value of at least ETB 1.315 Billion;Within the last ten (10) years that have been successfully and substantially completed (80% Completed).  
5GradeRC- 1or Gc-1 

4.2 Construction work of combolcha bypass road project

Item/NoQualification Criteria Minimum Requirement 
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 293 Million (Peak)ETB 734 Million(Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 550Million (Average).
2Liquid Asset/Cash Flow Requirement ETB 91 MillionETB 122 Million
3General Construction 2 Years of firm experience under construction contracts, Joint Venture partner, Management Contractor or sub5 Years of firm experience under construction contracts in the role of prime Contractor, Joint Venture partner, Management Contractor or sub
4Specific Construction Project ExperienceA Minimum of One (1) road maintenance or Construction/rehabilitation/ upgrading project with a value of at least ETB 514Million;  ORA Minimum of Two (2) any road maintenance or  Construction/rehabilitation/ upgrading project  each with a value of at least ETB 257 Million;In all cases, the experiences shall be within the last ten (10) years that have been successfully and substantially completed (70% Completed).A Minimum of Two (2) heavy road maintenance or  Construction/rehabilitation/ upgrading project  each with a value of at least ETB 734Million;Within the last ten (10) years that have been successfully and substantially completed (80% Completed).  
5GradeRC- 1or Gc-1 
 

5. If a bidder is awarded and/or recommended for award of any two works contracts by ERA six months prior to the bid submission date of the subject projects and until the award of the subject projects, the qualification criteria for the construction turnover will be the aggregate of the criteria of the subject projects; and that of the awarded contracts and/or those recommended to be awarded. A detailed qualification criterion is stated in the respective bidding documents. 



6. Interested eligible bidders may obtain further information from and inspect the bidding documents at the address given below from 8:30 a.m. to 12:30 a.m. and 1:30 p.m. to 5:30 p.m. local time from Monday to Thursday, and from 8:30 to 11:30 a.m. and 1:30 p.m. to 5:30 p.m. local time on Friday. A complete set of bidding documents prepared in the English language may be purchased by interested bidders on the submission of a written application to the address below and a nonrefundable fee of ETB 1,000 or USD 40 for each project, effective as of August 28, 2020. The method of payment shall be in cash or direct deposit to ERA’s account in the Commercial Bank of Ethiopia – Sengatera Branch through Account No. 01715-33144600. Address: Ethiopian Roads Authority, New Building Block A, Engineering Procurement Directorate, 1st Floor, Office No. 108, Tel: +251-11-833 29 81/ 515-30-15. 

7. Bidders can apply for one or for all or for any number of projects from the above-listed projects under the packages and shall submit their bid separately for each project they are interested to apply for. However, bidders may be awarded on the projects under a package subjected to fulfilling of the Qualification Criteria for individual and multiple projects specified in the respective bidding documents based on the Employer’s best economic advantage. 

8. Bidders shall submit their Bids in two envelopes, the first envelop labeled as “Qualification Information and Bid Security” and the second envelope “Financial Bid”, separate sealed and the two envelopes sealed in on another outer envelope. 

9. Evaluation is to be carried out in two stages, Qualification Information first and Financial Bids of qualified Bidders next. 

10. Bids must be delivered to the address, time, and date specified below. Each bid must be accompanied by a bid security of ETB 500,000.00 for each project in a format acceptable to the employer. Late bids will be rejected. One Original and five Copies of the bids have to be submitted. The Qualification information and Bid Security will be opened immediately after the submission deadline in the presence of bidders’ representatives who choose to attend, at the address below. 

11. The value of total certified payments received in each year shall be adjusted for inflation of Birr value through multiplying by Cn/Cofactor, where Cn is the value of 1 US Dollar in Birr on the 28 days prior to bid submission date and Co is the value of 1 US Dollar in Birr computed using the selling exchange rate prevailing on the last date of the respective fiscal year. 

12. For the Specific construction projects experience requirement, the Contract value of projects referenced by the bidder shall be adjusted to reflect the current purchasing power of Ethiopian Birr by multiplying with Cn/Cofactor, where Cn is the current selling exchange rate of 1 US Dollar to Ethiopian Birr which is taken at the 28th days prior to bid submission date and Co is the selling exchange rate of 1 US Dollar to Ethiopian Birr at the date of signing the contract. 

13.Bids must be delivered to the address below on or before October 12, 2020, at 2:30 P.M. 

Director-General 

2nd Floor, Conference Room 

Ethiopian Roads Authority Ras Abebe Aregay Street P. O. Box 1770 

Addis Ababa, Ethiopia Tel. +251-11-551 71 70/79 

Fax. +251-11-5514866 

14. The Ethiopian Roads Authority reserves the right to accept or reject any or all bids. 

ETHIOPIAN ROADS AUTHORITY 

3. Chanka – Gidami Design and Build Road Project…

Published on: Ethiopian Herald ( Aug 6, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

NOTICE OF INVITATIONS FOR BIDS 

1.The Federal Democratic Republic of Ethiopia (FDRE) has allocated budget towards the cost of the following Road Construction Projects and intends to apply part of this budget to payments under these projects.

Package III (3)
IT.NoProject NameEstimated length (km)Pavement typeProject durationContract deliveryProcurement type
1Construction Works of Chanka – Gidami Design and Build Road Project (Re-Bid)97AC4.0 YearsDBICB
2Construction Works of Agaro – Gera – Medabo Design and Build Road Project100.5AC4.0 yearsDBICB

Note: – DB = Design and Build; ICB = International Competitive Bidding;  and AC = Asphalt Concrete

2. The Ethiopian Roads Authority now invites bidders to submit sealed bids for providing the necessary labor, material and equipment for construction works of the above road projects.

3. Interested bidders shall submit the following evidence:

a. In the case of Ethiopian bidders, Certificate of Registration from the Ministry of Construction with the relevant Categories as specified in item 4 of tables below renewed for 2012 EFY and other appropriate documentary evidence demonstrating the bidder’s compliance, which shall include:

i) Trading License renewed for 2012 EFY;

ii) Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid at bid submission date;

iii) VAT Registration Certificate; and

iv)Registration as Supplier in the list of the mandated a public body, i.e. public Procurement and Property Administration Agency (PPPAA).

b. In case of bidders other than Ethiopians;

i) Business organization registration certificate or Trade License issued by the country of establishment.

ii) Tax Clearance Certificate issued from the Tax Authority (Inland Revenue Authority) which allows the bidder to participate in public tenders at the date of the deadline for bid submission if the foreign bidder already has ongoing or completed projects in the Country; Ethiopia.

4. Bidding will be conducted through an International Competitive Bidding (ICB) and procedures as specified on the tables above and is open to all eligible bidders as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash Flow, General and Specific Construction Experience for each of the project is as shown below:

4.1. Qualification and Evaluation Criteria of Package III (3) Road Projects

4.1.1. Construction Works of Chanka – Gidami Design and Build Road Project (Re-Bid)

Item/NoQualification CriteriaMinimum Requirement
Local BiddersForeign Bidders
1Annual construction turn over for the last five yearsETB 514 Million (Peak)ETB 1.285 Billion (Average)
2Liquid Asset/Cash flow requirementThe annual construction Turnover (ACT) Requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 964 Million (Average).
ETB 160 MillionETB 214 Million 
3General construction experience2 Years firm experience under construction contracts in the role of prime  Contractor, Joint Venture  partner, Management  Contractor or Sub-Contractor.5 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner, Manage ment Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of One (1)any type of Asphalt(DBST, TST or AC) RoadConstruction / Upgrading/Rehabilitation Projectwith a value of ETB 1.800Billion; OR A Minimumof Two (2) any type ofAsphalt (DBST, TST orAC) Road Construction /Upgrading/Rehabilitationprojects each with a value  of ETB 900 Million; ORA Minimum of Three(3) any type of Asphalt(DBST, TST or AC) RoadConstruction / Upgrading/ Rehabilitation projectseach with a value of ETB600 Million;all In cases, the  experiences shall be within  the last ten (10) years that  has been successfully and  substantially completed(70% Completed).A Minimum of Two (2) Asphalt Concrete (AC) Road Construction / Upgrading / Rehabilitation Projects each with a value of at least ETB 2.571 Billion within the last ten (10) years that has been successfully and substantially completed (80% Completed).
5GradeRC-1 or GC1 
     

1.1.2. Construction Works of Agaro – Gera – Medabo Design and Build Road Project

Item/NoQualification CriteriaMinimum Requirement
Local BiddersForeign Bidders
1Annual construction turn over for the last five yearsETB 546 Million (Peak)ETB 1.366 Billion ( Average)
2Liquid Asset/Cash flow requirementThe annual construction Turnover (ACT) Requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 1.025 Billion (Average).
ETB 170 MillionETB 227Million 
3General construction experience2 Years firm experience  under construction contracts in the role of prime  Contractor, Joint Venture  partner, Management  Contractor or Sub-Contractor.5 Years firm experience under construction contracts in the role of prime Contractor, Joint Venture partner, Manage ment Contractor or Sub-Contractor.
4Specific construction project experienceA Minimum of  One (1) any type  of asphalt (DBST,  TST or AC) Road  Construction  / Upgrading /  Rehabilitation  Project with a  value of ETB  1.913 Billion;ORA Minimum of  Two (2) any type  of asphalt (DBST,  TST or AC) Road  Construction  / Upgrading /  Rehabilitation  projects each  with a value of  ETB 956 Million;OR A Minimum  of Three (3) any  type of asphalt (DBST, TST or  AC) Road Construction / Upgrading / Rehabilitation projects  each with a value  of ETB 637 Million;In all cases, the  experiences shall  be within the last  ten (10) years that  has been successfully and substantially completed  (70% Completed).A Minimum of Two (2) Asphalt Concrete (AC) Road Construction / Upgrading / Rehabilitation Projects each with a value of at least ETB 2.733 Billion within the last ten (10) years that has been successfully and substantially completed (80% Completed).
5GradeRC-1 or GC1 
     

5. If a bidder is awarded and /or recommended for award of any two works contracts by ERA six months prior to the bid submission date of the subject projects and until award of the subject projects, the qualification criteria for the construction turnover will be the aggregate of the criteria of the subject projects; and that of the awarded contracts and/or those recommended to be awarded. A detailed qualification criterion is stated in the respective bidding documents.



6. Interested eligible bidders may obtain further information from and inspect the bidding documents at the address given below from 8:30 a.m. to 12:30 p.m. a and L:30 p.m. to 5:30 p.m. local time from Monday to Thursday, and from 8:30 to 11:30 a.m. and 1:30 p.m. to 5:30 p.m. local time on Friday.

A complete set of bidding documents prepared in English language may be purchased by interested bidders on the submission of a written application to the address below and a nonrefundable fee of ETB 1,000 or USD 40 for each project, effective as of August 10, 2020. The method of payment shall be in cash or direct deposit to ERA’s account in the Commercial Bank of Ethiopia – Sengatera Branch through

Account No. 01715-33144600.

Address: Ethiopian Roads Authority, New Building Block B,

Engineering Procurement Directorate, 1st Floor, Office No. 102,

Tel: +251-11-833 29 81/515-30-15.

7. Bidders can apply for one or for all or for any number of projects from the above listed projects under the package and shall submit their bid separately for each project they are interested to apply for. However, bidders may be awarded on the projects under a package subjected to fulfilling of the Qualification Criteria for individual and multiple projects specified in the respective bidding documents based on the Employer’s best economical advantage.

8. Bidders shall submit their Bids in two envelopes, the first envelop labeled as “Qualification Information and Bid Security” and the second envelope “Financial Bid”, separate sealed and the two envelopes sealed in on other outer envelope.

9. Evaluation is to be carried out in two stages, Qualification Information first and Financial Bids of qualified Bidders next.

10. Bids must be delivered to the address, time and date specified below. Each bid must be accompanied by a bid security of ETB 500,000.00 for each project in a format acceptable to the employer. Late bids will be rejected. One Original and five Copies of the bids have to be submitted. The Qualification information and Bid Security will be  opened immediately after the submission deadline in the presence of  bidders’ representatives who choose to attend, at the address below.

11. The value of total certified payments received in each year shall be  adjusted for inflation of Birr value through multiplying by Cn/Co factor, where Cn is value of 1 US Dollar in Birr on the 28th day prior to bid submission date and Co is the value of 1 US Dollar in Birr computed using the selling exchange rate prevailing on the last date of the respective fiscal year.

12. For the Specific construction projects experience requirement, the Contract value of projects referenced by the bidder shall be adjusted to reflect the current purchasing power of Ethiopian Birr by multiplying with Cn/Co factor, where Cn is the current selling exchange rate of 1 US Dollar to Ethiopian Birr which is taken at the 28th day prior to bid submission date and Co is the selling exchange rate of 1 US Dollar to Ethiopian Birr at the date of signing the contract.

13. Bids must be delivered to the address below on or before October 08, 2020 at 2:30 P.M.

Director General, New Building, Block B, 2nd Floor, Conference Room

Ethiopian Roads Authority, Ras Abebe Aregay Street

P. O. Box 1770, Addis Ababa, Ethiopia

Tel. +251-11-551 71 70/79, Fax. +251-11-5514866

14. The Ethiopian Roads Authority reserves the right to accept or reject any or all bids.

2. Durbete – Kunzila – Gelago – Metema Road Construction Projects…

Published on:Ethiopian Herald ( Jul 25, 2020 ) /Place of Bid Competitions:Addis Ababa,

Remaining Time for Bid Submission

NOTICE OF INVITATION FOR BIDS

1. The Federal Democratic Republic of Ethiopia (FDRE) has allocated budget towards the cost of the following Road Construction Projects and intends to apply part of this budget to payments under these projects.

Package II (2)
Item No.Project Name EstimatedLength (Km)Pavement Type Project DurationContract DeliveryProcurement Type 
1Construction Works of Durbete – Kunzila – Gelago – Metema, Lot 2: Fingit – Gelago Design and Build Road Project115.7AC3.5 YearsDBICB 
2Construction Works of Durbete – Kunzila – Gelago – Metema,Lot 3: Gelago – Gendewuha Design and Build Road Project125 AC3.5 Years DBICB 
3Addis –Gibe River Road Over- lay Project, lot 1: Addis –Sebeta Road Widening project (Re-Bid)11.89AC 3Years DBB ICB

Note:- DB = Design and Build; DBB=Design, Bid and Build ICB = International Competitive Bidding: AC = Asphalt Concrete

2. The Ethiopian Roads Authority now invites bidders to submit sealed bids for providing the necessary labor, material and equipment for construction works of the above road projects.

3. Interested bidders shall submit the following evidence:

a. In the case of Ethiopian bidders, Certificate of Registration from Ministry of Construction with the relevant Categories as specified in item 4 of tables below renewed for 2012 EFY and other appropriate documentary evidences demonstrating the bidder’s compliance, which shall include:

  • i. Trading License renewed for 2012 EFY;
  • ii. Tax Clearance Certificate, which states that the bidder can participate in any public tender, valid at bid submission date;
  • iii. VAT Registration Certificate; and
  • iv. Registration as Supplier in the list of the mandated public body, i.e. public Procurement and Property Administration Agency (PPPAA).

b. In case of bidders other than Ethiopians;

  • i. Business organization registration certificate or Trade License issued by the country of establishment.
  • ii. Tax Clearance Certificate issued from the Tax Authority (Inland Revenue Authority) which allows the bidder to participate in public tenders at the date of the deadline for bid submission if the foreign bidder already has on-going or completed projects in the Country; Ethiopia.

4. Bidding will be conducted through International Competitive Bidding (ICB) procedures as specified on the tables above and is open to all eligible bidders as specified and defined in the Bidding Documents. The minimum Annual Construction Turnover, Cash Flow, General and Specific Construction Experience for each of the project is as shown below:

Qualification and Evaluation Criteria of Package II (2) Road Projects

4.1 Construction Works of Durbete-Kunzila-Gelago-Metema,Lot 2: Fingit-Gelago Design and Build Road Project

Item/ NoQualification Criteria  Minimum Requirement
Local BiddersForeign Bidders
1Annual Construction  Turnover for the Last Five YearsETB 540Million (Peak)ETB 1.352 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 1.014 Billion (Average).
2Liquid Asset/Cash Flow RequirementETB 169 MillionETB 225 Million
3General ConstructionExperience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor.
4Specific Construction project ExperienceA Minimum of One (1) Any Type of Asphalt  (DBST,TST or Ac) Road  construction/Upgrading/ Rehabilitation project with a value of ETB 1.656 Billion ; ORA Minimum of Two (2) Any Type of Asphalt  (DBST,TST or Ac) Road  construction/Upgrading/ Rehabilitation project Each with a value of ETB 828 Million; ORA Minimum of Three (3) Any Type of Asphalt  (DBST,TST or Ac) Road  construction/Upgrading/ Rehabilitation project Each with a value of ETB 552 Million; In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2)  Asphalt concrete (AC) Road Construction or Upgrading or Rehabilitation projects Each with a value of at least ETB 2.366 Billion within the last ten (10) years that has been successfully and substantially completed (80% Completed).     
5GradeRC – 1 or GC-1 

4.2. Construction Works of Durbete-Kunzila-Gelago-Metema, Lot 3: Gelago-Gendewuha Design and Build Road Project

Item/ NoQualification Criteria  Minimum Requirement
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 566 Million (Peak)ETB 1.416 Billion (Average)
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 1.062 Billion (Average)
2Liquid Asset/Cash FlowRequirementETB 177 MillionETB 236 Million
3General ConstructionExperience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contract
4Specific Construction project ExperienceA Minimum of One (1) Any Type of Asphalt  (DBST,TST or Ac) Road  construction/Upgrading/ Rehabilitation project with a value of ETB 1.735 Billion ; ORA Minimum of Two (2) Any Type of Asphalt  (DBST,TST or Ac) Road  construction/Upgrading/ Rehabilitation project Each with a value of ETB 867 Million; ORA Minimum of Three (3) Any Type of Asphalt  (DBST,TST or Ac) Road  construction/Upgrading/ Rehabilitation project Each with a value of ETB 578 Million; In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2)  Asphalt concrete (AC) Road Construction or Upgrading or Rehabilitation projects Each with a value of at least ETB 2.479 Billion within the last ten (10) years that has been successfully and substantially completed (80% Completed). 
5GradeRC-1 or GC-1 

4.3 Addis-Gibe River Road Overlay project, Lot 1: Addis-Sebeta Road Widening (11.89 KM) (Re-Bid)

Item/ NoQualification Criteria  Minimum Requirement
Local BiddersForeign Bidders
1Annual Construction Turnover for the Last Five YearsETB 311 Million (Peak) ETB 778 Million (Average) 
The annual construction Turnover (ACT) requirement for a Joint Venture (JV) of Local and Foreign Firms is ETB 583 Million (Average)
2Liquid Asset/Cash Flow RequirementETB 97 MillionETB 129  Million
3General Construction Experience 2 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contractor5 Years Firm Experience under Construction Contracts in the role of Prime Contractor, Joint Venture Partner, Management Contractor or Sub-Contract Sub-Contractor
4Specific Construction project ExperienceA Minimum of One (1) Any Type of Asphalt  (DBST,TST or Ac) Road  construction/Upgrading/ Rehabilitation project with a value of ETB 817  Million ; ORA Minimum of Two (2) Any Type of Asphalt  (DBST,TST or Ac) Road  construction/Upgrading/ Rehabilitation project Each with a value of ETB 408 Million; ORA Minimum of Three (3) Any Type of Asphalt  (DBST,TST or Ac) Road  construction/Upgrading/ Rehabilitation project Each with a value of ETB 272 Million; In all cases, the experiences shall be within the last ten (10) years that has been successfully and substantially completed (70% Completed).A Minimum of Two (2) Asphalt Concrete Road Construction or Upgrading or Rehabilitation Projects Each with a Value of at least ETB 1.167 Billion within the last ten (10) years that has been successfully and substantially completed (80% Completed),
5GradeRC-1 or GC-1 

5.If a bidder is awarded and/or recommended for award of any two works contracts by ERA six months prior to the bid submission date of the subject projects and until award of the subject projects, the qualification criteria for the construction turnover will be the aggregate of the criteria of the subject projects, and that of the awarded contracts and/or those recommended to be awarded. A detailed qualification criteria is stated in the respective bidding documents.

6. Interested eligible bidders may obtain further information from and inspect the bidding documents at the address given below from 8:30 a.m. to 12:30 a.m. and 1:30 p.m. to 5:30p.m. local time from Monday to Thursday, and from 8:30 to 11:30 a.m. and 1:30 p.m. to 5:30 p.m. local time on Friday.

A complete set of bidding documents prepared in English language may be purchased by interested bidders on the submission of a written application to the address below and a nonrefundable fee of ETB 1,000 or USD 40 for each project, effective as of July 27, 2020. The method of payment shall be in cash or direct deposit to ERA’s account in the Commercial Bank of Ethiopia – Sengatera Branch through Account No. 01715-33144600.

Address: Ethiopian Roads Authority, New Building Block A, Engineering

Procurement Directorate, 1st Floor, Office No. 102, Tel: +251-11-833 29 81/515-30-15.

7. Bidders can apply for one or for all or for any number of projects from the above listed projects under the package and shall submit their bid separately for each project they are interested to apply for. However, bidders may be awarded on the projects under a package subjected to fulfilling of the Qualification Criteria for individual and multiple projects specified in the respective bidding documents based on the Employer’s best economical advantage.

8. Bidders shall submit their Bids in two envelopes, the first envelop labeled as “Qualification Information and Bid Security” and the second envelope “Financial Bid”, separate sealed and the two envelopes sealed in on another outer envelope.

9. Evaluation is to be carried out in two stages, Qualification Information first and Financial Bids of qualified Bidders next.

10. Bids must be delivered to the address, time and date specified below. Each bid must be accompanied by a bid security of ETB 500,000.00 for each project in a format acceptable to the employer. Late bids will be rejected. One Original and five Copies of the bids have to be submitted. The Qualification information and Bid Security will be opened immediately after the submission deadline in the presence of bidders’ representatives who choose to attend, at the address below.

11. The value of total certified payments received in each year shall be adjusted for inflation of Birr value through multiplying by Cn/Co factor, where Cn is value of 1 US Dollar in Birr on the 28 day prior to bid submission date and Co is the value of 1 US Dollar in Birr computed using the selling exchange rate prevailing on the last date of the respective fiscal year.

12. For the Specific construction projects experience requirement, the Contract value of projects referenced by the bidder shall be adjusted to reflect the current purchasing power of Ethiopian Birr by multiplying with Cn/Co factor, where Cn is the current selling exchange rate of 1 US Dollar to Ethiopian Birr which is taken at the 28th days prior to bid submission date and Co is the selling exchange rate of 1 US Dollar to Ethiopian Birr at the date of signing the contract.

13. Bids must be delivered to the address below on or before October 01, 2020 at 2:30 P.M.

Director General

2nd Floor, Conference Room

Ethiopian Roads Authority

Ras Abebe Aregay Street

P. O. Box 1770

Addis Ababa, Ethiopia

Tel. +251-11-551 71 70/79

Fax. +251-11-5514866

14.The Ethiopian Roads Authority reserves the right to accept or reject any or all bids.

ETHIOPIAN ROADS AUTHORITY

1.CONSTRUCTION WORKS OF SHAMBU-AGEMSA ROAD UPGRADING PROJECT

Published on: Ethiopian Herald ( Jul 24, 2020 ) /Place of Bid Competitions:Addis Ababa

Remaining Time for Bid Submission

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA ETHIOPIAN ROADS AUTHORITY

CONSTRUCTION WORKS OF SHAMBU-AGEMSA ROAD UPGRADING PROJECT

INVITATION FOR BID

1. The Federal Democratic Republic of Ethiopia (FDRE) has applied for financing from the OPEC Fund for International Development (OFID) and Arab Bank for Economic Development in Africa (BADEA) for the Shambu – Agemsa Road Upgrading Project. 

2. The Ethiopian Roads Authority (ERA) on Behalf of the FDRE invites international eligible Contractors (including all members of a joint venture and all Subcontractors of bidders) for the Shambu – Agemsa Road Upgrading Project. 

3. In general, the proposed Shambu – Agemsa Road Upgrading Project consists of upgrading of the existing gravel road to Asphalt Concrete Surfacing to ERA DC5 standard. The project road is located in the Oromia National Regional state in the south western part of Ethiopia. The project is an existing 95 km long gravel road which starts at Shambu town that is located on the Baku – Shambu – Agemsa link road and terminates at Agemsa town which is situated on the Nekemt – Bure road. Shambu town is about 303 km from Addis Ababa via the Addis Ababa – Ambo – Bako road. The terrain classification of the project road indicates that 2.13% of it passes through flat terrain while 82.51%, 14.22% and 1.04% of it traverses through rolling, mountainous and escarpment terrains respectively. The project road is designed as a two-way two-lane carriageway with a DC 6 road standard (As per ERA’s Geometric design Manual-2013). The total length of the designed road is 95.25 km to be Constructed in Asphalt Concrete Surfacing of 5cm thickness for the Carriageway and also involving the Construction & Rehabilitation of Two Bridges of 22 and 14ms lengths, respectively, each having 10m widths. It will have a total of 7.0 m carriageway width with 3.5 m wide parking lane on its each side for Zonal and Woreda Seats and 2.5 m wide parking lane on its each side for Kebele Seats. The Zonal and Woreda Seats will also have 2.5 m wide footway on both sides of the road. Furthermore, the Zonal Seats will have 2.5m and Woreda seat Im wide median. In rural Sections, the project road will have 1.5 m wide shoulder for flat and rolling terrain sections and 0.5 m wide shoulder for mountainous and escarpment terrain sections. The surfacing of the shoulders is designed to be Double Bituminous Surface Treatment (DBST) for all the rural sections of the project road. The town sections will have side ditches on both sides of the road. Time of completion of the project is 1278 Calendar days including mobilization period of 120 calendar days. 

4. Eligible Applicants may obtain further information from, and inspect and acquire the Bidding Documents, at: Address: Ethiopian Roads Authority (ERA) Ras Abebe Aregay Street ERA Headoffice, New Building Block B, 1st Floor, Office No. 105, P.O. Box 1770 Addis Ababa, Ethiopia. Tel.No. +251-11-515 10 877 515-04-19 Fax No. (251 11) 551-48-66/554 44 34 

5. Bidders may obtain a complete set of bidding documents at the above office starting from July 27, 2020 and upon payment of a non-refundable fee of 300 US$ (Three Hundred Sixty US dollars) or 10,000 ETB (Ten Thousand Ethiopian Birr). Payment shall be made in cash, bank certified check or telegraphic transfer to the Employer’s Bank Account in the Commercial Bank of EthiopiaSengatera Branch through Account No. 01715-33144600. The document will be sent by registered airmail if required so by the bidder but under no circumstances will the procuring entity be held responsible for late delivery or loss of the documents so mailed. 

6. Bidding will be conducted through the International Competitive Bidding (ICB) procedure specified in the bidding documents, and is open to all eligible bidders. The minimum General and Specific Construction Experience is as shown below: 

Table 6.1: Construction Works of Shambu Agemsa Road Upgrading Project 

Item NoQualification CritereaMinimum Requirement 
1Annual construction turn overUSD 50.0 Million Average Construction Turnover) 
2Liquid Asset/Cash Flow requirementUSD 10.0 Million 
3General Construction projectExperience  10 Years firm Experience in Construction 
4Specific Construction projectExperience  Two (2) new Asphalt Concrete (AC) road Construction or rehabilitation or upgrading each with a value of USD 53.0 Million within the last ten  (10) years that has been successfully and substantially completed (80% Completed) 
5Specific Construction projectExperience In Key Activities    Item no Item Description Unit Quantity
 Earthwork cut & borrow to fill cut to spoil common and intermediate Rock excavation M3/Year 1,100,000.00
 Crushed Sub base M3/Year75,000.00 
Crushed Stone Base  M3/Year70,000.00 
4Asphalt Concrete AC surface dressingM2/Year280,000.00

7. The bidding procedure to be followed is a two-envelope procedure. The post-qualification documents and financial offers should be sealed in two separate envelopes. The first envelope containing the post-qualification application and bid security is clearly marked “Post Qualification Application and Bid Security” and the second envelope that contains the offer is marked “Submission of Offer” for the Construction Works of Shambu – Agemsa Road Upgrading Project respectively and the two envelopes shall also be enclosed by an outer envelope marked “Post Qualification Application and offer for Construction Works of Shambu – Agemsa Road Upgrading Project. Evaluation is also to be carried out in two stages, the post qualification application and the bid security will be opened first and the qualification evaluation will be undertaken. The bid that are responsive to the minimum post qualification criteria will be opened for further evaluation. The offers of those bidders who fail the minimum qualification criteria shall be returned unopened after the award of contract. 

8. All bids must be accompanied by a security in the form and amount specified in the bidding documents, and delivered to: Director General, 2nd Floor, Conference Room Ethiopian Roads Authority, Ras Abebe Aregay Street P. O. Box 1770, Addis Ababa, Ethiopia On /or before September 29, 2020 @ 2:30 P.M. Local Time. The Bids shall be prepared in one original and four copies. Bids must be accompanied by a bid security of USD 1,000,000.00 (United States Dollar: One Million) or Equivalent in a format acceptable to the Employer. Late bids will be rejected. Post-Qualification Application and Bid security of the bidders will be opened immediately thereafter in the presence of the Procurement Endorsing Committee and bidders’ representatives who choose to attend on the final date and time of bid submission and at the address stated here above. 

9. The Ethiopian Roads Authority reserves the right to accept or reject any or all bids. 

Address: 

Ethiopian Roads Authority (ERA), Ras Abebe Aregay Street ERA Headoffice, New Building Block B, 1st Floor, Office No. 105, P.O. Box 1770, Addis Ababa, Ethiopia. 

Tel. No. +251-11-515 10 871 515-04-19 

Fax No. (251 11) 551-48-66/554 44 34 

Ethiopian Roads Authority

You cannot copy content of this page