The Best Construction Tenders Advertiser in Ethiopia

Tenders

Contractor

Read more

 

Consultant

Read more

 

Machinery Rental

Read more

 

Direct Unit Price

Read more

 

Construction of Roads

Published on:Ethiopian Herald ( Dec 17, 2020 )Place of Bid Competitions:Somali Regional state Godey City
Rough Estimation of Remaining Time for Bid Submission (don’t use it before check up!)

Please Check the Countdown!

Invitation for Bids (IFB)

Somali Regional state Godey City Administration Finance Office

The Godey City Administration has funds for the Construction of Roads for fiscal year 2013 Godey City Administration now invites sealed bids from qualified eligible bidders for the construction of Roads for the sites stated below.

Table 1: Construction of cobblestones

Item No. Description of worksProcurement reference no
1From main asphalt to subaan khaddar

school (length=140m width=7m area =980m² with drainage (length=140m width 1lm) area = 140m²
UIIDP/GODE/CW/

1

CSR/01/13
2From main asphalt to new asphalt(length =140m width =10m area =1400m2 with drainage (length=140mwidth=lm )area=140 m² UIIDP/GODE/CW/

CSR/02/13
3From main asphalt to quran school(length=47m width=7 ) area = 329m² UIIDP/GODE/CW/

CSR/03/13
4From qalinle sugaal house to jayga

(length=430m width=10m ) area 4300m²

with drainage (length=430m width=1m

)Area =430m2
UIIDP/GODE/CW/

CSR/04/13
5From suuqa balka to ali hashi house

(length =158m width=10m ) area 1580m²

with drainage ( length=158m width

=lm) Area 158m²
UIIDP/GODE/CW/

CSR/05/13
6From Airport asphalt road to nursing

college asphalt road (length=400m

width=10.5m )Area =4200m² with

drainage(length=400m width =1m )

Area=400m2
UIIDP/GODE/CW/

CSR/06/13
7

From second road to third road neighbor

to green land (length=35m width =10m)

Area =350m2
UIIDP/GODE/CW/

CSR/07/13

Table 2: Gravel roads

Lot/NODescription of Gravel RoadsPackage number
1From WFP to hawo faruuro (length=600m

width=10m ) Area = 6000m²
Gode/CIP/CW/

GR/01/13
2From bercaano road to mayor office (length

=600m width =10m) Area =6000m²
Gode/CIP/CW/

GR/02/13
3From cobblestone to dakhare raasin (length

=302m width=6m )Area =1812m²
Gode/CIP/CW/

GR/03/13
4From nurse college to Elpa electric station

(length=1600m width=10m)Area =16000m²
Gode/CIP/CW/

GR/04/13
5From illalo road to lafaha geela (length

=1500m width =10m ) Area= 15000m²
Gode/CIP/CW/

GR/05/13
6From jayga to ring road middle of 06 and 08

kebele ( length=1000m width =10m) Area

10,000m2
Gode/CIP/CW/

GR/06/13
7From Farhaan house to Imaam shaafic school

(length=600m width=10m) Area =6000m²


Gode/CIP/CW/

GR/07/13

Table 3: construction

Lot/noDescription of WorksPackage number
1Construction of Fencing mayor officeGode/CIP/CW/01/13
2Construction of Fencing ugaas mashkoke

primary and secondary school
Gode/CIP/CW/02/13
3Construction of four kebeles officeGode/CIP/CW/03/13
4Construction of two Shade marketGode/CIP/CW/04/13
5Pedestrian walkwayGode/CIP/CW/05/13
6Construction of police office
Gode/CIP/CW/06/13
7Maintenance of city service officeGode/CIP/CM/08/13

Table 4: construction of drainage

LOT/NODescription Of DrainagePackage number
1

From WFP to sharif sheik Abaase (length=260m width=1m) with precast concrete

cover Area=260m 
UIIDP/Gode/CW/

DR/01/13
2Drainage from shariif Ahmed to shade

market of kebele-10 (length 345.5m width=1.8m) with precast concrete cover Area

=621.9m2 
UTIDP/Gode/CW/

DR/02/13
3

Drainage of maintenance from subaan

khadar to Gode stadium (length=1770m

width=1.85) Area =3274.5m²
UIIDP/Gode/CM

DR/03/13

Table 5 : construction of greenery

Lot/NoDescription Of GreeneryPackage number
1Inside of guest house (length=70m

width= 12m )Area= 840 m²


UIIDP/GODE/CW/GR/01/13
2Inside of youth center Area =

16,000m2
UIIDP/GODE/CW/GR/02/13

3. Bidders are required to present a copy of their renewed licenses, VAT registration certificate, supplier’s registration certificate, tax clearance certificate and copy of VAT sales invoice.

4. Contractors shall furnish that they have performed at least two similar contract of a similar nature during the last 2 & 3 years.

5. A complete set of bidding documents in English language may be purchased starting from the date this invitation is announced, from the office mentioned below and upon the payment of a non-refundable fee of Ethiopian Birr 500 (five hundred birr) on the submission of a written application to the address below. The method of payment will be in cash.

6. Contractors must have suitable construction machineries and skilled manpower

7. Contractors are not allowed to participate more than two lots.

8. The bid must be delivered to the SRS GCA, Finance Office at or before 3:00 PM on 20th day of announcement of this invitation for bid notice on the Ethiopian herald news paper. Late bids will be rejected.

9. Bid will be opened in the presence of the bidders or their representatives who choose to attend in person at 3:30 PM on 20th day of announcement of this invitation for bid otice on the Ethiopian herald news paper at the SRS GCA Finance Office. If there will be public holiday and weekend on this date, the closing and opening of the bid will take place on the next working day at the same time and the same venue. The bid must be accompanied a bid security of not less than 2% of the total bid price.

10. The GCA Finance Office reserves the right to reject all or part of the bid.

The Somali Regional State Godey City Administration

Tell: +251257762107 /0913692873/0915760732

Leave a Comment

Your email address will not be published. Required fields are marked *

You cannot copy content of this page